1-5 of 5
Keywords: drilling operation
Close
Sort by
Proceedings Papers

Publisher: BHR Group
Paper presented at the 11th North American Conference on Multiphase Production Technology, June 6–8, 2018
Paper Number: BHR-2018-443
... and horizontal wells [2, 3]. Brown et al. [4] investigated the performance of different fluids including water and polymers on annular hole cleaning by conducting experiments in a specially designed flow loop. Their work provided a broader picture of the hole cleaning in the drilling operations. Adari et al. [5...
Proceedings Papers

Publisher: BHR Group
Paper presented at the 10th North American Conference on Multiphase Technology, June 8–10, 2016
Paper Number: BHR-2016-017
... the model may be completely wrong if the flow pattern is not correct. equation fluid flow two-phase flow application bhr group 2016 solid bed transient solid-liquid two-phase flow mixture layer drilling operation conservation equation directional drilling simulation solid concentration...
Proceedings Papers

Publisher: BHR Group
Paper presented at the 10th North American Conference on Multiphase Technology, June 8–10, 2016
Paper Number: BHR-2016-053
... test section superficial gas velocity bhr group 2016 slug upstream oil & gas drilling operation dimensionless slug length well configuration lateral section slug flow development production logging reservoir surveillance vertical section modeling & simulation Abstract...
Proceedings Papers

Publisher: BHR Group
Paper presented at the 7th North American Conference on Multiphase Technology, June 2–4, 2010
Paper Number: BHR-2010-H3
... drilling operation reservoir surveillance transport velocity particle size transportation upstream oil & gas artificial intelligence particle radial transport mechanism directional drilling production logging coherent structure observation area shear velocity concentration frequency...
Proceedings Papers

Publisher: BHR Group
Paper presented at the 7th North American Conference on Multiphase Technology, June 2–4, 2010
Paper Number: BHR-2010-J3
... bhr group 2010 water cut nitrogen injection brine production monitoring production control bottomhole pressure cleanup procedure drillstem testing simulation reservoir surveillance choke operation upstream oil & gas drilling operation cleanup operation gas lift string...

Product(s) added to cart

Close Modal