1-20 of 63
Keywords: requirement
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
SPE Drill & Compl 38 (03): 546–560.
Paper Number: SPE-214682-PA
Published: 13 September 2023
... borehole trajectory asia government resistance curvature buoyancy coefficient deflection requirement completion geology geologist Construction of a conventional horizontal well is challenging due to the tiny displacement in front of the horizontal well target when the geological structure...
Journal Articles
SPE Drill & Compl 38 (03): 561–569.
Paper Number: SPE-214700-PA
Published: 13 September 2023
... of product qualification testing. The proposed TRL2 test methods and design criteria in this work are derived from the best practices of the product design and also from the existing environmental and EMC stress test methods for the subsea product qualification process for TRL3 and TRL4 requirements ( Arif...
Journal Articles
SPE Drill & Compl 38 (03): 444–451.
Paper Number: SPE-214577-PA
Published: 13 September 2023
... selection and formulation drilling fluid chemistry packer karimfazli cement chemistry cement slurry cement formulation injector pipe foundation placement spe drilling requirement fraction rayleigh-taylor instability open-ended pipe The plug cementing operation is a troublesome...
Journal Articles
SPE Drill & Compl 38 (01): 18–33.
Paper Number: SPE-208754-PA
Published: 08 March 2023
... License (CC-BY 4.0). information fusion bayesian inference data mining upstream oil & gas artificial intelligence knowledge graph workflow uncertainty exhibition trajectory requirement operation quality europe government propagation united states government big data spe...
Journal Articles
SPE Drill & Compl 35 (04): 628–643.
Paper Number: SPE-199751-PA
Published: 17 December 2020
... hydraulic fracturing fracturing materials fracturing fluid Artificial Intelligence regional sand white sand oil production Upstream Oil & Gas completion fracture conductivity well performance conductivity basin requirement permeability SPE Drilling sand type pressure transient analysis...
Journal Articles
SPE Drill & Compl 33 (03): 252–258.
Paper Number: SPE-187098-PA
Published: 08 June 2018
..., and reached the section TD without incident and at the desired rate of penetration (ROP). After the section TD was reached, the ABR successfully opened the 12¼-in. rathole to the desired 14 in., allowing the liner to be set 3 ft from the bottom. Normally, this type of operation would require a separate...
Journal Articles
SPE Drill & Compl 31 (04): 250–260.
Paper Number: SPE-178821-PA
Published: 06 July 2016
...)], inconsistent pit volume gains, and others. Overlay plots of current and historical flow and pit-volume data have been shown to be valuable in significantly reducing the time required by the user to validate anomalous pumps-off event data automatically identified by IDAPS. On the basis of an extensive...
Journal Articles
SPE Drill & Compl 30 (03): 187–197.
Paper Number: SPE-170919-PA
Published: 27 August 2015
... longevity and service life, completion and intervention options, and regulatory compliance push the limits of materials and services. The successful completion of HP/HT wells requires advanced materials evaluations, collaboration among many disciplines, and sufficient time for product development...
Journal Articles
SPE Drill & Compl 28 (01): 60–64.
Paper Number: SPE-163103-PA
Published: 04 January 2013
... footage capacity by approximately 60%. Because the rate of penetration (ROP) is fast in gas-percussion drilling, it requires injection of an adequate quantity of nitrogen gas to clean the hole. However, a high rate of gas injection often causes wellbore erosion and deviation problems. It is imperative...
Journal Articles
SPE Drill & Compl 27 (04): 516–530.
Paper Number: SPE-150022-PA
Published: 07 November 2012
... predicted that surface and production sections would experience temperatures in excess of 285°C (545°F) and considerable stress across weak formations. A key design requirement was long-term integrity of the cement sheath over an expected 25- to 30-year field life span. Complicating this requirement...
Journal Articles
SPE Drill & Compl 26 (03): 419–431.
Paper Number: SPE-119468-PA
Published: 06 September 2011
... requirement specimen sealability configuration intensity evaluation program Twccep contact intensity requirement iso 13679 SPE Drilling procedure loading protocol Tubular loading conditions in extreme-temperature wells, such as steam-assisted gravity drainage (SAGD) and cyclic steam...
Journal Articles
SPE Drill & Compl 26 (01): 32–40.
Paper Number: SPE-128418-PA
Published: 01 March 2011
...S.J.. J. Sawaryn; N.. Whiteley; A.. Deady; A.. Borresen; N.. Gibson Summary The paper discusses how data quality influences workflows and decision making in drilling and completions and examines the use of semiautomated processes for quality assurance. With poor data, additional steps are required...
Journal Articles
SPE Drill & Compl 25 (04): 419–425.
Paper Number: SPE-119884-PA
Published: 14 October 2010
... development and to classify them into a number of key categories. The more significant interface requirements will be identified, and key safety concerns will be highlighted. Parallels will be drawn with other industries to demonstrate analogs and suggest where and how further developments might be expected...
Journal Articles
SPE Drill & Compl 25 (03): 328–335.
Paper Number: SPE-114246-PA
Published: 27 July 2010
... in similar cases in the oilwell-drilling industry. Second, a systematic experimental/theoretical approach for optimization of cement slurry in accordance with functional requirements is documented. In this research, an original cement slurry was designed for a field in the south of Iran subject...
Journal Articles
SPE Drill & Compl 25 (03): 336–345.
Paper Number: SPE-119442-PA
Published: 15 April 2010
... some MPD results from Kvitebjøm and discusses automatic control requirements for drilling operations. The requirements for MPD operations include a specified accuracy for a set of normal operations, such as rate changes and set point ramping during connections, surge and swab, and some failure...
Journal Articles
SPE Drill & Compl 25 (02): 199–209.
Paper Number: SPE-116541-PA
Published: 25 February 2010
... of the areas that require more attention. This paper discusses some of the challenges in the development of the Al Shaheen reservoirs offshore Qatar and how they were overcome. Some of these wells have a stepout in excess of 30,000 ft with a total vertical depth of 3,100 to 3,500 ft, and thus, they offer some...
Journal Articles
SPE Drill & Compl 24 (04): 626–641.
Paper Number: SPE-110524-PA
Published: 23 December 2009
... assurance production rate packer gas well completion design december 2009 completion equipment selection gravel pack requirement SPE Drilling reservoir Cannonball field Cannonball reservoir characterization drilling fluid chemistry subsea system flow assurance well performance production...
Journal Articles
Journal Articles
SPE Drill & Compl 24 (03): 383–389.
Paper Number: SPE-112292-PA
Published: 27 September 2009
... and the selected sandface completion type, a water-based fluid system was required. This paper discusses the design of the fluids to give full hydrate inhibition, maximize breaker effectiveness, provide low overbalance, and reduce corrosion risk. An extensive research and development program was initiated...
Journal Articles
SPE Drill & Compl 24 (03): 430–435.
Paper Number: SPE-111637-PA
Published: 27 September 2009
..., residual oil content, cuttings throughput, and overall energy requirements are discussed in this paper. This is the first step in the development of a modular system, with low-deck impact, flexible processing rates, and reduced environmental signature. (1) P d = 2 π f ε 0 ε ′ ′ | E...

Product(s) added to cart

Close Modal