Abstract
This paper details the rational floatover analysis method and its application in the successful floatover installation of the LW3-1 CPP Topsides. The main purpose of the floatover analyses is to determine the design loads and operability for each stage during docking, mating, and undocking operations. The findings of the parametric sensitivity studies ensure the integrity of the mega topsides and the preinstalled jacket, as well as the T-shaped barge, and therefore enable the challenging floatover installation as rapidly as possible coincident with safe practice in the deep water and harsh environment of South China Sea.
This content is only available via PDF.
2014. International Society of Offshore and Polar Engineers
You can access this article if you purchase or spend a download.