1-20 of 622
Keywords: installation
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-460
... Institute (e.g., API 571 – Damage Mechanisms Affecting Fixed Equipment in the Refining Industry and API 2510 – Design and Construction of LPG Installations), the United States National Fire Protection Association (e.g., NFPA 58 – Liquefied Petroleum Gas Code and NFPA 59A – Standard for the Production...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-037
... characteristic stiffness psd installation dsus engineering subsea system ocean engineering correlation artificial intelligence floatover installation lmus pearson correlation coefficient heatmap dynamic load characteristic international ocean engineering conference experimental...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-001
... (Section 4) - Gravity anchors (Section 5) - Offshore installations (Section 6) - Water and concrete block mixed ballast system (Section 7) - Offshore rigs made up of portable floating pontoons (Section 8) Additionally, some basic design calculations to verify above works are briefed in Section 9. Work...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-479
... the pipeline. Nevertheless, there is a notable gap in addressing deformation damage caused by the drag anchor hooking onto pipeline during installation and subsequent raising anchor. Addressing the aforementioned challenges, this paper utilizes the CEL method to construct a coupled model involving anchor...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-591
... ABSTRACT For the purpose of acquiring mechanical data to determine the time of installation work for shaft and rudder system in shipbuilding process, a technique was developed to evaluate welding deformation of large metal structures using finite element analysis. Additionally, the distance...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-573
... (lng) concentration epoxy adhesive adhesive thickness installation strength Proceedings of the Thirty-fourth (2024) International Ocean and Polar Engineering Conference Rhodes, Greece, June 16 21, 2024 Copyright © 2024 by the International Society of Offshore and Polar Engineers (ISOPE) ISBN...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-067
... ABSTRACT Unconventional oils in extreme regions are difficult to produce because of their high viscosity. In this study, we conducted a simulation study to improve the productivity of heavy oil in cold regions. Installation of pumps, heating using downhole heaters, and insulation type...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-117
... in Developing U.S. Ports for Floating Offshore Wind Farms Yongjun Chen, Xin Hai, Bert Chua, Wenzhi Li, Ramadevi Duraisamy Bechtel Energy Inc., Houston, Texas, USA ABSTRACT The utilization of offshore wind energy has grown significantly during the past 30 years since the installation of the first offshore wind...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-126
..., appropriate means of increasing the lowering velocity can be taken to reduce the sling tension. INTRODUCTION Aiming at the gas-water replacement technology in the bucket during the lowering installation of the multi-bucket jacket foundation, the lowering construction method of actively storing part...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-155
... Energy Converter Installation on Pantelleria Giulia Cervellia, Claudio Moscolonia, Giuseppe Giorgia, Giuliana Mattiazzoa Marine Offshore Renewable Energy Lab, Politecnico di Torino Torino, Italy ABSTRACT The research aims to identify the best location for a Wave Energy Converter (WEC) on Pantelleria...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-192
... ABSTRACT Due to the complex marine environment loads, large horizontal deflection of marine risers, and contact and collision between risers and internal pipe strings will occur during drilling string installation and drilling process, resulting in drilling string wear and deformation, which...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-181
... The embedment of the offshore exposed pipelines after installation has a significant influence on its subsequent responses. In this study, the cyclic laying effects on the pipe embedment both in sand and clay were investigated by model tests. It is found that the cyclic loads cause the further significant...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-195
...-induced vibration (VIV) fatigue damage during the wet parking phase of SLWRs is analyzed in this paper, which is found to be significant and could exceed the installation fatigue budget. SLWR pre-laid route is also discussed in this paper taken project examples. INTRODUCTION Steel catenary risers...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-198
..., especially for brown fields where numerous pipelines, umbilicals and cables have been installed on the seabed. Thus, crossing design needs to be increasingly and carefully accommodated due to the increased density of subsea fields. However, literature on pipeline crossing design is rare (El-Chayeb et al...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-169
... foundations. Consequently, the installation of monopile foundations becomes a critical aspect of design where the accurate prediction of pile driveability performance is used to inform the installation approach, hammer selection, and pile driving induced fatigue. This paper explores the use of machine...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-165
... for offshore wind turbines, regarding over 80% of installations (Ivan Komusanac, 2022). The literature showed that several factors can alter the monopile response under lateral loading: soil density (Bayton and Black, 2016), the method of monopile installation (Staubach et al., 2020), geometric properties...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-213
... ABSTRACT Direct electrical heating is a flow assurance method for subsea flowlines. This article considers direct electrically heated flowlines that were installed at an offshore facility in 2004. In 2022, one of the piggyback cables was successfully repaired. The root cause for failure was dielectric...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-204
... ABSTRACT Lateral buckling design for flowlines in deep and ultra-deep water often relies on the use of sleepers or distributed buoyancy modules as buckle initiators. However, these methods can be associated with complex engineering, manufacturing or installation and may not be cost-effective...
Proceedings Papers

Paper presented at the The 34th International Ocean and Polar Engineering Conference, June 16–21, 2024
Paper Number: ISOPE-I-24-228
... offshore pipeline feasibility assessment arctic engineering torsional rotation residual curvature international conference as-laid torsional rotation flowchart rotation installation limitation lateral ibrahim Proceedings of the Thirty-fourth (2024) International Ocean and Polar...

Product(s) added to cart

Close Modal