1-20 of 37
Keywords: pipe
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Eleventh Ocean Mining and Gas Hydrates Symposium, June 21–27, 2015
Paper Number: ISOPE-M-15-207
... pipe water swivel drilling mud diameter pressure hose upstream oil & gas drilling method top-drive head core sample drilling rig sea water drilling bit drilling pipe sample collector drilling inner pipe collector drilling equipment dual-wall drilling pipe The Reverse...
Proceedings Papers

Paper presented at the Eleventh Ocean Mining and Gas Hydrates Symposium, June 21–27, 2015
Paper Number: ISOPE-M-15-028
... formulas under different mining conditions. The results show that the farther away from buffer mining collector is, the smaller tilt angle of hose is; and the more difficult solid particles transportation is, the higher critical velocity is needed to avoid pipe clogging, and the more pressure drop...
Proceedings Papers

Paper presented at the Eleventh Ocean Mining and Gas Hydrates Symposium, June 21–27, 2015
Paper Number: ISOPE-M-15-217
... Abstract Pump performance of a submersible centrifugal type is investigated experimentally using a multiphase vertical flow loop. Methane in water is tested under turbulent bubbly pipe flows. Some tests are conducted at a three-phase equilibrium point of methane-water-methane hydrate. The pump...
Proceedings Papers

Paper presented at the Tenth ISOPE Ocean Mining and Gas Hydrates Symposium, September 22–26, 2013
Paper Number: ISOPE-M-13-030
... ABSTRACT The effect of slurry velocity and concentration on the coarse-grained particle-water mixtures flow behavior and pressure drops was studied in horizontal and inclined pipes of inner diameter 100 mm. The study revealed that the coarse-grained particle-water mixtures were significantly...
Proceedings Papers

Paper presented at the Tenth ISOPE Ocean Mining and Gas Hydrates Symposium, September 22–26, 2013
Paper Number: ISOPE-M-13-045
... pipe omco environmental guideline mining system deflection ocean mining system upstream oil & gas mining system development metals & mining operation Third-Generation Commercial Mining System Development for Manganese Nodules: Direct-to- vs. Incremental-to-5,000-m Approach Jin S...
Proceedings Papers

Paper presented at the Tenth ISOPE Ocean Mining and Gas Hydrates Symposium, September 22–26, 2013
Paper Number: ISOPE-M-13-080
... precision artificial intelligence parabolic approximation piping design sensor unit approximation projection endpoint fusion information pipe identification pressure sensor electrical engineering piping simulation accelerometer coefficient sensor metals & mining depth...
Proceedings Papers

Paper presented at the Ninth ISOPE Ocean Mining Symposium, June 19–24, 2011
Paper Number: ISOPE-M-11-014
.... To develop the lifting technology, the shallow lifting test was conducted near sea at Hupo port of East Sea of Korea. The depth of the sea was about 100m. The lifting system for deep ocean mineral resources includes flexible hoses, lifting pump, buffer, lifting pipes and control/measurements devices. For May...
Proceedings Papers

Paper presented at the Ninth ISOPE Ocean Mining Symposium, June 19–24, 2011
Paper Number: ISOPE-M-11-034
... ABSTRACT: The present paper describes the experimental investigation of model coarse-grained slurry on a re-circulation pipe loop with smooth stainless steel pipes. Graded pebble gravel and glass balls were used as a model for poly-metallic nodules, and very fine glass beads as a model...
Proceedings Papers

Paper presented at the Ninth ISOPE Ocean Mining Symposium, June 19–24, 2011
Paper Number: ISOPE-M-11-021
... in the vertical pipe. It also analyzes the influence of factors such as particle concentration, diameter, gradation and boundary conditions on single and group suspension velocity. At the same time, it obtains empirical formula of suspension velocity of particle and group particles in vertical lifting...
Proceedings Papers

Paper presented at the Eighth ISOPE Ocean Mining Symposium, September 20–24, 2009
Paper Number: ISOPE-M-09-039
... of the bathymetry near Kavaratti island The cold water for this land based plant needed a pipe to be deployed to about 300 m water depth in the ocean that was available at about 500 m from the shoreline. A view of the bathymetry near the plant was shown in Fig. 2. High Density Poly Ethylene (HDPE) pipes of 0.63-m...
Proceedings Papers

Paper presented at the Eighth ISOPE Ocean Mining Symposium, September 20–24, 2009
Paper Number: ISOPE-M-09-050
... ocean floor manganese nodule buffer mining system offshore software pacific ocean data mining operation upstream oil & gas metals & mining miner simulation pipe chung nodule hughes glomar explorer isope symp Fig. 1 Hughes Glomar Explorer ABSTRACT The review...
Proceedings Papers

Paper presented at the Eighth ISOPE Ocean Mining Symposium, September 20–24, 2009
Paper Number: ISOPE-M-09-031
... University of Technology Gliwice, Poland ABSTRACT Flow of solid-liquid mixtures with different density and size of particles was investigated in a horizontal pipe loop. Concentration distribution in the vertical profile was measured with use of a radiometric method. The paper analyses the influence...
Proceedings Papers

Paper presented at the Eighth ISOPE Ocean Mining Symposium, September 20–24, 2009
Paper Number: ISOPE-M-09-021
... on the deep-ocean mining system is mainly focused on static and dynamic analyses of the rigid pipe or flexible hose independently. Although geometrical nonlinear static and dynamic responses of the rigid pipe with free-hanging bottom end were studied by finite element method (Chung,1978; Chung and Felippa...
Proceedings Papers

Paper presented at the Eighth ISOPE Ocean Mining Symposium, September 20–24, 2009
Paper Number: ISOPE-M-09-016
..., and gradually pulled into the sea water by mining tool. Considering the variable length of the immersed riser, a numerical model is presented to capture the dynamics of the riser with a lumped mass approximation. Discretization scheme for riser and pipe geometry and methodology for calculating the internal...
Proceedings Papers

Paper presented at the Seventh ISOPE Ocean Mining Symposium, July 1–6, 2007
Paper Number: ISOPE-M-07-034
... drilling operation and the implementation of the next Deep Sea Drilling Project (DSDP) with a 10,000 tons class vessel, Glomar Challenger in 1968. drilling vessel upstream oil & gas penetration reservoir characterization chikyu drilling operation riser pipe drill pipe sea floor...
Proceedings Papers

Paper presented at the Sixth ISOPE Ocean Mining Symposium, October 9–13, 2005
Paper Number: ISOPE-M-05-021
... and Magnus lift force were included. The collisions between particles as well as between particles and the pipe wall were also simulated. The simulated results show some motion characteristics of nodules in hydraulic hoist. These results agree with the experimental results in general. INTRODUCTION One...
Proceedings Papers

Paper presented at the Sixth ISOPE Ocean Mining Symposium, October 9–13, 2005
Paper Number: ISOPE-M-05-001
... total integrated mining system (TIS) and control (Brink and Chung, 1980): Ship-, pipe-, buffer- and connection- to-miner and miner, and transshipment (Fig. 1). Surface ship system. Very little in the way of new work can be found in recent surface ship system developments, including the heavy-lift...
Proceedings Papers

Paper presented at the Sixth ISOPE Ocean Mining Symposium, October 9–13, 2005
Paper Number: ISOPE-M-05-017
... ABSTRACT: A discrete element method (DEM) is proposed for the analysis of deepocean mining pipe system based on the combination of multi-body dynamics and structural dynamics. The pipe is divided into some rigid elements that are linked by flexible connectors, which are described by 6-DOF...
Proceedings Papers

Paper presented at the Sixth ISOPE Ocean Mining Symposium, October 9–13, 2005
Paper Number: ISOPE-M-05-022
... ABSTRACT: The issues of sediment siltation in vertical pipes for hydraulic lifting are frequently encountered in vertical pipes. Most of the proposed formulas had no physical meaning due to lack of comprehensive analysis of impact factors. Based on the experiments on single particle settling...
Proceedings Papers

Paper presented at the Sixth ISOPE Ocean Mining Symposium, October 9–13, 2005
Paper Number: ISOPE-M-05-014
... mining system is used on an ocean poly-metallic nodule pilot mining. This consists of a surface ship, an underwater collector, an acoustic positioning subsystem, and a lifting pipe subsystem. The surface ship experiences great surge and sway because of the stochastic sea wave. The wave-induced motions...

Product(s) added to cart

Close Modal