1-2 of 2
Keywords: installation work
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the The Thirteenth ISOPE Pacific/Asia Offshore Mechanics Symposium, October 14–17, 2018
Paper Number: ISOPE-P-18-121
... installation process, more than 5,000tons of a mega block is manufactured and installed using dual crane vessels (Jung et al. 2016). For these kinds of crane operations, a thorough review of the installation work should be made before the real-sea operation. Model tests related to floating crane vessel...
Proceedings Papers

Paper presented at the The Thirteenth ISOPE Pacific/Asia Offshore Mechanics Symposium, October 14–17, 2018
Paper Number: ISOPE-P-18-076
... ABSTRACT The complexity due to the narrow space in a vessel or the complicated outfitting system of an offshore plant structure causes considerable ambiguities in the installation work. In this paper, an algorithm to determine the installation order for the geometric location of the piping...

Product(s) added to cart

Close Modal