1-8 of 8
Keywords: risk management
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the ISRM SINOROCK 2013, June 18–20, 2013
Paper Number: ISRM-SINOROCK-2013-119
... level Design Optimization Upstream Oil & Gas max pressure evaluation risk management primary hole reduce max pressure absorption flow in porous media hydrogeological zone core recovery hydrogeological zoning permeability rock mass enhancement grout consumption maximum pressure grout...
Proceedings Papers

Paper presented at the ISRM SINOROCK 2013, June 18–20, 2013
Paper Number: ISRM-SINOROCK-2013-131
... the function of visualization of result at low cost, it makes possible to carry out monitoring in wider areas to improve the risk management practices. In this paper, a new sensor for monitoring ground deformation ahead of mountain tunneling face is introduced. The sensor consists of plastic optical fiber...
Proceedings Papers

Paper presented at the ISRM SINOROCK 2013, June 18–20, 2013
Paper Number: ISRM-SINOROCK-2013-146
.... Considering these factors, a way to follow is the application of risk assessment in the design. Artificial Intelligence Upstream Oil & Gas evaluation risk management displacement failure probability excavation face Reservoir Characterization risk assessment investigation rock mass...
Proceedings Papers

Paper presented at the ISRM SINOROCK 2013, June 18–20, 2013
Paper Number: ISRM-SINOROCK-2013-136
... normal operation risk level risk and uncertainty assessment law enforcement tunnel face microseismic activity tunnel excavation risk management Upstream Oil & Gas tunnel construction consequence rockburst probability hazard bearing body Reservoir Characterization risk assessment Risk...
Proceedings Papers

Paper presented at the ISRM International Symposium on Rock Mechanics - SINOROCK 2009, May 19–22, 2009
Paper Number: ISRM-SINOROCK-2009-189
... area, not easily accessible and wooded, was not just a matter of one cliff generating some rock falls, but included a potential volume of a few million cubic metres. From the moment the landslide hazard was identified, the risk management was based on a monitoring system associated with an emergency...
Proceedings Papers

Paper presented at the ISRM International Symposium on Rock Mechanics - SINOROCK 2009, May 19–22, 2009
Paper Number: ISRM-SINOROCK-2009-174
... risk management risk assessment tunnel construction rail transportation Engineering ground transportation collapse case information identification investigation risk and uncertainty assessment potential loss Accident tree analysis tunnel collapse procedure construction statistics...
Proceedings Papers

Paper presented at the ISRM International Symposium on Rock Mechanics - SINOROCK 2009, May 19–22, 2009
Paper Number: ISRM-SINOROCK-2009-200
... project management prediction application geological condition strategic planning and management mitigation measure ve workshop Tunnel Project construction risk management water inflow geological risk Hong Kong specification Workshop monitoring extreme geological condition...
Proceedings Papers

Paper presented at the ISRM International Symposium on Rock Mechanics - SINOROCK 2009, May 19–22, 2009
Paper Number: ISRM-SINOROCK-2009-157
..., providing a stability risk (potential for failure) and safety risk (consequences of failure) associated with the geotechnical characteristics at each location; The hazard associated with each feature was evaluated and classified as significant. risk management operational quarry...

Product(s) added to cart

Close Modal