This article, written by Assistant Technology Editor Karen Bybee, contains highlights of paper SPE 78543, "Pushing the Limits in Extra-Long Cased Horizontal Drains Acidification: Use of Double-Trigger Perforation Technique to Maximize Productivity and Optimize Rig Time," by Michael Buffet, SPE, Emmanuel Derbez, and Pierre Leschi, SPE, Total, and Scott MacRae, Halliburton, prepared for the 2002 SPE Abu Dhabi International Petroleum Conference and Exhibition, Abu Dhabi, 13-16 October.
This content is only available via PDF.
2003. Society of Petroleum Engineers
You can access this article if you purchase or spend a download.