Production management in shipyards is one of the most significant activities impacting productivity. On-site managers and production planners still do not have sufficient production information to enable on-site scheduling because of restricted information sharing among departments. In this research, the main production management challenges were determined from workflow simulations of the production planning processes. An analysis of the requirements for effective communication between production management and on-site personnel was undertaken to establish an integrated hull construction, outfitting, and painting execution system architecture for shipyard applications, developed following the component-based design methodology. The proposed systems key functions encompass stages from block assembly to hull outfitting at the quay, and enable visualization of the production progress through color differentiation to maximize production information sharing. The proposed system facilitates the transmission of reliable and accurate production information to all relevant personnel in an appropriate timeframe.
Skip Nav Destination
Article navigation
Journal Paper|
May 01 2020
Development of an IHOP Execution System Based on Analyses of Shipyard Production Planning Process
Kwangkook Lee;
Kwangkook Lee
Kyungnam University, Changwon
Search for other works by this author on:
Jong Gye Shin
Jong Gye Shin
Seoul National University
Search for other works by this author on:
J Ship Prod Des 36 (02): 131–142.
Paper Number:
SNAME-JSPD-2020-36-2-131
Article history
Published Online:
May 01 2020
Citation
Lee, Kwangkook, and Jong Gye Shin. "Development of an IHOP Execution System Based on Analyses of Shipyard Production Planning Process." J Ship Prod Des 36 (2020): 131–142. doi: https://doi.org/10.5957/jspd.2020.36.2.131
Download citation file:
Sign in
Don't already have an account? Register
Personal Account
You could not be signed in. Please check your username and password and try again.
Captcha Validation Error. Please try again.
Pay-Per-View Access
$35.00
Advertisement
36
Views
Cited By
Email Alerts
Advertisement
Suggested Reading
Modeling for Ship Design and Production
J Ship Prod (February,1992)
Development of a Logic-Based Product Life-Cycle Management (LBPLM) System for Shipbuilding Industry—Conceptual Development
J Ship Prod Des (November,2010)
Computer-Aided Manufacturing in Small Shipyards: A U.S. and U.K. Comparative Study
J Ship Prod (May,1995)
Design for Production: Principles and Implementation
J Ship Prod (February,2000)
Shipyard Modeling—An Approach to a Comprehensive
J Ship Prod (May,1991)
Advertisement