A Mid-Term Fast Sealift Technology Development Program producibility study was undertaken by the Manufacturing Systems Division (Code 125) of the Naval Surface Warfare Center, Carderock Division for the Naval Sea Systems Command Computer Aided Engineering Division, Ship Design and Engineering Directorate, SEA 507. The producibility project team was initially tasked to identify and evaluate possible design improvements with regard to their potential impact upon the cost of construction for the Baseline 0a rough-order-of-magnitude geared-diesel option. This particular design variant is a 30-knot twin-screw, 289 m (948 ft) roll-on/roll-off vessel with four 18 PC4.2V medium-speed diesels producing 85 619 kW (114 817 hp) of installed power. The construction cost estimate developed by NAVSEA for the variant is $385 million per ship. In addition to the NAVSEA-assigned task, the team reviewed the producibility aspects of the Navy auxiliary ship procurement process with regard to finding methods that would facilitate major reductions in the construction contract cycle, as time is now recognized as a major cost driver in ship procurement. The construction contract cycle is defined as the amount of time from construction contract award to delivery, and was estimated by NAVSEA to be 42 months for the subject ship.
Skip Nav Destination
Article navigation
Journal Paper|
May 01 1993
Reducing the Construction Contract Cycle for Naval Auxiliary Ships
Mark H. Spicknall;
Mark H. Spicknall
The University of Michigan
Search for other works by this author on:
Michael Wade
Michael Wade
Naval Surface Warfarce Center
Search for other works by this author on:
J Ship Prod 9 (02): 121–136.
Paper Number:
SNAME-JSP-1993-9-2-121
Article history
Published Online:
May 01 1993
Citation
Spicknall, Mark H., and Michael Wade. "Reducing the Construction Contract Cycle for Naval Auxiliary Ships." J Ship Prod 9 (1993): 121–136. doi: https://doi.org/10.5957/jsp.1993.9.2.121
Download citation file:
Sign in
Don't already have an account? Register
Personal Account
You could not be signed in. Please check your username and password and try again.
Captcha Validation Error. Please try again.
Pay-Per-View Access
$35.00
Advertisement
7
Views
Cited By
Email Alerts
Advertisement
Suggested Reading
Generic Build Strategy—A Preliminary Design Experience
J Ship Prod (February,1996)
A Revolution in Warship Design: Navy-Industry Integrated Product Teams
J Ship Prod (November,1996)
A Comparative Study of U.S. and Foreign Naval Acquisition, Design, and Construction Policy and Practices
J Ship Prod (August,1996)
Producibility in the Naval Ship Design Process: A Progress Report
J Ship Prod (November,1993)
The Naval Ship Design/Production Interface
J Ship Prod (August,1986)
Advertisement