1-20 of 70
Keywords: assembly
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Journal Articles
J Ship Prod Des 40 (03): 125–132.
Paper Number: SNAME-JSPD-08230019
Published: 27 August 2024
... known as blocks. These blocks are individually constructed and subsequently assembled at the final workstation, denoted as the block joining station. Upon completing block fabrication, a deliberate tolerance allowance is retained on the plates to accommodate deformations induced by heat treatment during...
Journal Articles
J Ship Prod Des 40 (01): 10–22.
Paper Number: SNAME-JSPD-11210028
Published: 29 February 2024
... operation ship production and design hoisting disturbance assembly requirement deviation algorithm Journal of Ship Production and Design, Vol. 40, No. 1, February 2024, pp. 10 22 httpdx.doi.org/10.5957/JSPD.11210028 Research on Berth Hoisting Planning Based on Digital Twin Lipeiyong, Zhaoqiqiang...
Journal Articles
J Ship Prod Des 39 (03): 154–163.
Paper Number: SNAME-JSPD-06220019
Published: 21 August 2023
... is extremely time-consuming and laborious. The final hull is composed of intermediate products, such as subassemblies, unit assemblies, and grand-assemblies (Cho et al. 1999). Since the group technology was applied in hull construction, a series of production lines has been established based on the process...
Journal Articles
J Ship Prod Des 38 (03): 172–181.
Paper Number: SNAME-JSPD-01220001
Published: 31 August 2022
... PRODUCTION AND DESIGN 173 to adapting their production toward lean manufacturing. The use of a PWBS shipyard organization enables the continually repetitive nature of assembled interim products such as unit panels and transverses, which form larger blocks when assembled together (Kolic et al. 2012). The task...
Journal Articles
J Ship Prod Des 35 (04): 309–316.
Paper Number: SNAME-JSPD-2019-35-4-309
Published: 01 November 2019
... ship november 2019 assembly construction project construction Journal of Ship Production and Design, Vol. 35, No. 4, November 2019, pp. 309 316 httpdx.doi.org/10.5957/JSPD.07180023 Management of a Ferry Construction Project Using a Production- Oriented Design Methodology Carlos Mascaraque-Ram...
Journal Articles
Journal Articles
J Ship Prod Des 35 (03): 273–280.
Paper Number: SNAME-JSPD-2019-35-3-273
Published: 01 August 2019
..., the level of IHOP application differs among shipyards. There is still much rework and outfitting that is performed on the slipway or in the dry-dock as opposed to during the assembly or preerection construction phase. The main aim of IHOP is to construct and outfit and paint ship blocks to a high degree...
Journal Articles
J Ship Prod Des 35 (03): 281–288.
Paper Number: SNAME-JSPD-2019-35-3-281
Published: 01 August 2019
...-induced deformation creates a significant manufacturing challenge during fabrication of major ship assemblies, especially for thin-plate steel construction. The objective of this project was to improve weld sequence planning (WSP) capabilities for major ship assemblies through the development of a quick...
Journal Articles
J Ship Prod Des 34 (03): 202–210.
Paper Number: SNAME-JSPD-2018-34-3-202
Published: 01 August 2018
...Damir Kolich; Richard L. Storch; Niksa Fafandjel The main shipbuilding assembly processes greatly influence the flow of interim products in a newbuilding shipyard. The panel assembly line is a major process located upstream of all the other shipyard assembly processes. In a previous paper...
Journal Articles
J Ship Prod Des 34 (03): 211–225.
Paper Number: SNAME-JSPD-2018-34-3-211
Published: 01 August 2018
...Duncan Camilleri Hull penetration and openings are governed by standards, which ensure the structural integrity of the assembly. However, a number of stiffeners are usually welded to the panel, giving rise to welding residual stresses and distortion. This study identifies the optimal position...
Journal Articles
J Ship Prod Des 33 (04): 291–309.
Paper Number: SNAME-JSPD-2017-33-4-291
Published: 01 November 2017
... assembly at extreme rudder angles as high as ±40°. For simplicity, the geometry of the vessel was not modeled in these simulations. The experimental results are presented along with the computational results for all three rudder cases. The lift and drag measurements are in good agreement...
Journal Articles
J Ship Prod Des 33 (03): 237–246.
Paper Number: SNAME-JSPD-2017-33-3-237
Published: 01 August 2017
...Cristiano Fragassa A new design and construction procedure for manufacturing wooden boats is presented, based on modular, parameterized components produced by computer numerical control (CNC) machining. This semiautomated procedure greatly reduces time requirements for vessel assembly compared...
Journal Articles
J Ship Prod Des 31 (04): 230–240.
Paper Number: SNAME-JSPD-2015-31-4-230
Published: 01 November 2015
...Li Peiyong; Cui Jin; Gao Feng; Wang Chengfang; Mao Yunsheng; Liao Guohong Reasonable optimized block assembly sequence has vital practical significance for ship construction, and the research has been done in this article at the aim of obtaining optimal assembly sequence. First, taking a double...
Journal Articles
J Ship Prod Des 31 (03): 201–208.
Paper Number: SNAME-JSPD-2015-31-3-201
Published: 01 August 2015
... 2015 2015 Society of Naval Architects and Marine Engineers shipyard productivity coating process naval vessel foreign shipyard coating assembly coating posterection surface preparation production technology commercial yard Japan ship production commercial vessel benchmarking...
Journal Articles
J Ship Prod Des 29 (03): 105–116.
Paper Number: SNAME-JSPD-2013-29-3-105
Published: 01 August 2013
... transportation parallel subblock shipyard Modeling & Simulation workstation simulation result subblock kanban Upstream Oil & Gas lean manufacturing block assembly application ship production curvature block Production Line conveyer assembly production system deadline stockyard...
Journal Articles
J Ship Prod Des 27 (04): 186–193.
Paper Number: SNAME-JSPD-2011-27-4-186
Published: 01 November 2011
... production process Artificial Intelligence triangular mass customization delivery schedule product variety Engineering simulation model assembly knowledge management ship production requirement interim product customization ship shipyard november 2011 completion time shipbuilding completion...
Journal Articles
J Ship Prod Des 26 (02): 117–134.
Paper Number: SNAME-JSPD-2010-26-2-117
Published: 01 May 2010
.... 2010. The Society of Naval Architects and Marine Engineers tack gravitational force ship production residual stress seam welding tack welding fabrication procedure fabrication procedure tack welding angular distortion assembly distortion bottom tack tack weld position Welding out...
Journal Articles
J Ship Prod Des 24 (01): 12–16.
Paper Number: SNAME-JSP-2008-24-1-12
Published: 01 February 2008
... Schedule planning & scheduling constraint information assembly scheduling system Artificial Intelligence spatial scheduling tool spatial plan shipyard ship production floor space space allocation configuration file marine transportation spatial scheduling Lee activity schedule...
Journal Articles
J Ship Prod Des 23 (02): 118–124.
Paper Number: SNAME-JSP-2007-23-2-118
Published: 01 May 2007
... of Naval Architects and Marine Engineers ship assembly ship production native format specification long-term retention requirement Implementation Agreement neutral file format geometry repository information management product model data representation schema Long-Term Retention...
Journal Articles
J Ship Prod Des 23 (01): 1–6.
Paper Number: SNAME-JSP-2007-23-1-1
Published: 01 February 2007
...-aided design (CAD) model. However, production engineers manually read and analyze the assembly drawings with the detailed process of production, create, and input the master data. It is a time consuming job and also the data are neither clear nor accurate. In this study, we have developed a production...

Product(s) added to cart

Close Modal