Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-2 of 2
Keywords: flow period
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the Offshore Technology Conference Brasil, October 29–31, 2019
Paper Number: OTC-29749-MS
... producing a fluid with a higher density than the shallower perforated intervals. The higher density of the produced fluid from this deeper interval caused the wellbore fluids to slug during the flow periods with a measureable response in the pressure and temperature data. If this difference in the fluid...
Proceedings Papers
Publisher: Offshore Technology Conference
Paper presented at the OTC Brasil, October 29–31, 2013
Paper Number: OTC-24395-MS
...-in for a 24-hr build-up period. The next step was to open the well for the main flow period, but after only five and a half hours had to be shut-in because of bad weather conditions. The main flow period was started again and the well was flowing on ½ choke for around 48 hours. The well was then shut...