1-20 of 28
Keywords: accommodation
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2019
Paper Number: OTC-29313-MS
... conference offshore industry subsea system accommodation capacity upgrade crane vessel floating production system van wijngaarden modification conversion offshore unit transformation installation lay vessel fpso hull requirement supply vessel support vessel construction upgrade...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2017
Paper Number: OTC-27772-MS
... for this project highlighted many of these areas and highlighted areas in which rules require development and careful interpretation. sov service operation vessel gangway renewable energy upstream oil & gas accommodation subsea system requirement sea state drilling equipment configuration...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2012
Paper Number: OTC-23169-MS
... be adjusted several times during the removal process. Several make safe campaigns are required offshore and onshore. At an early stage the accommodation facilities will have to be removed because of their outside position and then will no longer be available to the dismantling crew. 2 OTC 23169 When large...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2011
Paper Number: OTC-21799-MS
... in the Arabian Gulf. Most recently, ADMA-OPCO has been engaged in applying the technology to projects such as the Das Island Permanent Accommodation (DIPA) project as well as the Satah Al-Raaz Boot (SARB) field development. ZADCO has made significant progress in expanding drilling and production from the Upper...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2009
Paper Number: OTC-20263-MS
... offshore technology conference fishing vessel engineering canada upstream oil & gas double bottom halifax shipyard marine transportation otc 20263 forward section shipbuilding marine structure installation cradle reservoir characterization compressor trawler accommodation...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2008
Paper Number: OTC-19680-MS
... and the number of wells needs to be accommodated within both two fields. This paper will explain the advantage, disadvantage and lessons learned form having a shallow water control platform to control both two fields. And accommodate future expansion. Introduction Simian / Sapphire fields development...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2003
Paper Number: OTC-15215-MS
... offshore for crew members can challenge their mental and physical fitness levels, which in turn may impact crew and installation productivity, performance, and safety. To help maintain appropriate levels of fitness, crew members must be provided with properly designed accommodations and workspaces...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2002
Paper Number: OTC-13999-MS
..., accommodation, topsides, flare boom and offloading equipment have been studied carefully before selecting the final location on the general arrangements. The basic drawings of general arrangements, lines, mid-ship section, accommodation layout and outfitting systems are developed. The basic hydrostatic...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2002
Paper Number: OTC-14095-MS
... generation: 6 x LM6000 gas turbines Accommodation: 100 persons Availability Production: Continuous, all sea states Minimum availability: 92 % Offloading/connection: Hs = 3.5 m Offloading: Hs = 4.5 m Offloading time: 12-15 hours + hook- up/disconnection FIELD-DEPENDENT DESIGN FEATURES Weather Conditions...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2002
Paper Number: OTC-14202-MS
... technology conference infrastructure gas infrastructure accommodation cpu option bptt gas infrastructure Copyright 2002, Offshore Technology Conference This paper was prepared for presentation at the 2002 Offshore Technology Conference held in Houston, Texas U.S.A., 6 9 May 2002. This paper...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 1997
Paper Number: OTC-8410-MS
... management project manager accommodation floating production system SYNOPSIS The Glas Dowr FPSO paper describes a modern "Fast Track" Bluewater Project that began in December 1995 and will be completed with "First Oi/" targeted in May 1997. The Glas Dowr was "Converted and Outfitted...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 1997
Paper Number: OTC-8389-MS
.... production unit fpso accommodation year operation specification campos basin vlcc service life offshore technology conference floating production system assayag marlim modification conversion work petrobras subsea system upstream oil & gas prallon ship engineering operation OTC...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 1996
Paper Number: OTC-8075-MS
... phenomenon, in which also the draft conditions of the barge play a role. process area separation and treating topsides facility module interface main deck loading accommodation production separator topsides turret barge tank layout topsides deck stage separator fpso separator...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 1996
Paper Number: OTC-8259-MS
... continental shelf subsea system offshore installation risk analysis shelf requirement drilling unit certificate class class accommodation fpso mooring system classification rule regime drilling equipment turret requirement arrangement installation upstream oil & gas...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 1995
Paper Number: OTC-7697-MS
..., flexible risers and subsea well technologies. However, the emergence of FPSO's as a standard way of developing a field is fairly recent, and this is probably due to the extension by the Oil Companies of the boundaries for the development of new fields. shuttle tanker accommodation optimum...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 1995
Paper Number: OTC-7836-MS
... tanker upstream oil & gas discharge offshore installation convention accommodation ship otc 7836 requirement machinery floating production system OTC 7836 Engineering Requirements for the Classification Production, Storage and Offloading Units. W.S. Rogers and J.S.C. Bloomfield, Lloyd s...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 1995
Paper Number: OTC-7926-MS
... provide ample capacity (about 48,000 m3) to maintain sufficient draught in ballast condition. All water ballast tanks and systems are segregated from the oil storage tanks. Accommodation for 120 persons will be arranged in the forward part of the vessels. cargo tank mooring system diameter...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 1994
Paper Number: OTC-7424-MS
... subsea system shuttle tanker operation upstream oil & gas transfer system flowline accommodation turret transfer system fpso gryphon hose floating production system generator separation production well requirement stage separator ship thruster mooring system turret otc...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 1994
Paper Number: OTC-7458-MS
... mode of operation in combination with a fixed platform development. Making use of the drilling vessel's accommodation, power generation, mud pumping, cleaning and storage facilities etc. can reduce the Platform topsides weight by up to 3000 tonne [1], which in turn may make a Ml installed jacket...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 1992
Paper Number: OTC-6928-MS
... modu evacuation fra accommodation explosion safety case lord cullen production platform assessment OTC 6928 Risk Analysis of MODU S Following Lord Cullen s Report J.J. Stiff, Noble Denton & Assocs. Inc.; Mike Kucharski, Santa Fe Drilling Co. (North Sea) Ltd.; and J,C. Trickey and R.L. Jack...

Product(s) added to cart

Close Modal