1-20 of 360
Keywords: completion
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35535-MS
... stress cycles on completion. Furthermore, the analysis determines the maximum drawdown and pressure drop limits along the wellbore and flow lines, enabling operators to optimize well performance in real-time. remediation of hydrates asphaltene inhibition geologist build-up scale inhibition...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35575-MS
... to dual-laterals with intelligent flow control, intervention capabilities, and improved junction integrity as common multilateral completion strategies in the Middle East. Observation wells are commonly used to monitor reservoir behavior during the production from the same reservoir in producer wells...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35600-MS
... such as: well productivity, inflow performance along the horizontal section of the well and aquifer support. Understanding these unknowns was essential to define drainage strategy and FFD design. To improve economic results, long Open Hole Horizontal Gravel Pack wells were required and following completion...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 5–8, 2025
Paper Number: OTC-35995-MS
... Abstract An injector well that maintains flow conformance and integrity across the well lifecycle requires detailed planning of downhole completions. Use of Outflow (Inflow) Control Devices (ICDs) and Inflow control valves (ICVs) provide the flexibility and control over injector well...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35032-MS
... Abstract The intelligent well completion in Brazilian Pre-salt wells poses challenges for workover operations. This paper describes the main challenges faced and the new methods employed for workover in this scenario. Since acid stimulation caused severe fluid losses in these wells, which...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35076-MS
... issues as soon as they are identified. A large number of contracts were executed to deliver the FPU including separate topsides engineering, hull engineering, topsides fabrication and integration, hull fabrication, and systems completion contracts. The Anchor hull was fabricated in South Korea...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35103-MS
... Abstract The design and development of pre-salt projects prioritized a set of resources and tools for field management, providing greater flexibility in reservoir management strategies. Among these design facilities, the alternating injection of water and gas (WAG) and intelligent completion...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35105-MS
... enclosure issue elect pressurization enclosure corroded asset integrity restart bonga floating production systems completion tam offshore technology conference shutdown Introduction During Turn Around Maintenance, a lot of activities are planned to be done in the TAM window. Statutory...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35303-MS
... installation, mooring pre-lay, FPU installation, steel catenary risers (SCR) pull-in, and subsea equipment heavy lifts. Utilization of this proven solution enabled installation campaigns to be completed in weather conditions and contingency scenarios that could not have been completed with alternative...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35344-MS
...-35344-ms contract revitalization reduction completion drillship campos basin contribution optimization offshore technology conference rig The inception of the Campos Basin Revitalization Program (CBRP) took place in 2020, marking the establishment of a structured plan. This comprehensive...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35379-MS
...What Is an All-Electric Completion? All-electric completions are integral part of the full electrification of oil and gas production systems that aims to replace the entire hydraulic infrastructure downhole, at seabed, and topside with electric systems, thus opening new performance...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35200-MS
...Well Integrity Designing CO2 injection wells involves options like re-completing existing wells, side-tracks, or drilling new wells. Re-completing offers economic advantages but selecting candidates that meets integrity requirements, both internal company policies and local regulations...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35332-MS
... construction tree algorithm completion Introduction Artificial intelligence (AI) has increasingly been changing the way the oil industry operates, with breakthrough technologies and processes. Whether in asset management, oil production, refinery, logistics, or commercialization, AI enables...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2024
Paper Number: OTC-35465-MS
... Abstract A new horizontal geothermal well solution can be used to harvest geothermal energy by producing a heated fluid circulated in a closed loop completion. Typical wells are drilled to a vertical depth of 2-4 km depth depending on the temperature requirement with a 2-5 km horizontal section...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2023
Paper Number: OTC-32414-MS
... of 17 Ksi and injection rates of 15 MMscf/day. This paper provides an overview of Vito's drilling and completions, in-well gas-lift system, development process, validation and testing requirements, key challenges encountered during the project, and the technologies. This paper is part of a Vito Project...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2023
Paper Number: OTC-32488-MS
... and assembly. Non-Destructive Examination (NDE) – Magnetic Particle Inspection (MPI) was selected to inspect the fillet weld joint connections because RT or UT is not practical. Considering the possibility of delayed cracking, fillet welds were inspected using MPI after 3 days of weld completion, and MPI...

Product(s) added to cart

Close Modal