1-3 of 3
Keywords: penetration speed
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, August 16–19, 2021
Paper Number: OTC-31006-MS
... vibrohammer extraction process approx application penetration speed installation The foundation validation involved an onshore test phase (2016-2017), followed by an offshore test phase (2018-2019/2020). Both test phases involved a monopile that was installed with a vibratory hammer...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2019
Paper Number: OTC-29400-MS
... some 6 months the pile was extracted, and pile driving simulations and VDA were done both for the installation and extraction phase. test phase hammer prediction platform design dynamic soil property wind energy penetration speed renewable energy soil profile subsea system application...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2001
Paper Number: OTC-13096-MS
... (penetration speed, position and verticality of sampler ) with a recovery from the mudline to a maximum depth of 30 meters below seabed. Description of the STARFISH system The patented system consists in a double tube (Fig. 1). The inside tube (core sampling tube or corer) is equipped with an inside stationary...

Product(s) added to cart

Close Modal