1-20 of 132
Keywords: topsides
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2023
Paper Number: OTC-32254-MS
... to be simple and replicable, while retaining the highest levels of safety in design and execution. To illustrate the values and pride of the Vito project, a cool logo was needed. The center part of the Vito logo is an elevation view of the topsides sitting on what could be seen as two hull columns...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2023
Paper Number: OTC-32462-MS
... FPS at a single fabrication yard, commissioning, and preparation for offshore installation. This paper is part of a Vito Project series at OTC 2023 and the other papers are listed in the references. The Vito Floating Production System (FPS) has a Lightship of 21,500 mt, Topside Lift Weight of 8,700...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2023
Paper Number: OTC-32503-MS
... to change in 2015, the project faced significant financial hurdles, and the project team decided to refresh the design concept to reduce cost and simplify. The team regrouped to propose a smaller semi-submersible Floating Production System (FPS) with a simplistic mooring design. The Topsides was designed...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 1–4, 2023
Paper Number: OTC-32518-MS
... Abstract This paper provides an overview of the design of the Vito topsides production train and the overall approach to achieve a minimum technical scope, a simplistic design, and limit the payload to 10,000 st. A 10,000 st topsides target was utilized in order to fabricate a single topsides...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 2–5, 2022
Paper Number: OTC-31869-MS
... of equipment, providing data and allowing the implementation of the Site Working Hours as a KPI for new projects. Indeed, in addition to traditional KPIs like CAPEX, OPEX or topside weight, this new KPI driven by the reduction of Site Working Hours can lead to a very different design and interestingly...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30892-MS
... conference operator requirement upstream oil & gas flowline subsea gathering system fpf production operator operation subsea production equipment topsides midstream sponsor engineering Westney , Richard ; " Achieving Predictable Project Costs in an Unpredictable World ", 38 th...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30604-MS
... cost california oc platform offshore california water depth cost savings oc platform removal cost us government topsides disposal information db 2000 offshore technology conference offshore facility decommissioning upstream oil & gas tsb cost estimate platform hlv db platform...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30873-MS
... of the four topsides that make up the Johan Sverdrup field center in the first phase of the development. The technology – developed by the installation contractor and qualified for first use worldwide by the operator – saved an estimated 2.5 million offshore manhours from the offshore completion phase, which...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30709-MS
... disadvantage of the spar is arguably the logistics of deck installation, which normally requires an offshore heavy lift. The paper discusses the research that was done on heavy topsides floatover for the spar, and the successful floatover operations both offshore and inshore. The paper provides a unique look...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30847-MS
... peoples as well as terrestrial flora and fauna. FLNG facilities also have the potential of serving multiple offshore fields over the life of the facility, thereby reducing the minimum size field that can be economically monetized. Three major decisions for FLNG topsides are pretreatment, liquefaction...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30514-MS
... conditions in almost every offshore oil producing basin in the world, with a large range of topsides throughput for both oil and gas. The paper has summarized the development of the FPSO system as a function of time, water depth, location, system, type and complexity to illustrate its adaptability...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30496-MS
... Abstract This paper presents an evaluation of the topsides and jacket removal programme for Miller Platform decommissioning, which was developed not only to fulfil the UK’s laws and regulations but also to minimise the risks in safety, environment, technical execution, society and economics...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 4–7, 2020
Paper Number: OTC-30907-MS
... configuration subsea system fpss gom petrobras discovery modu fpso topsides platform riser mooring system pipeline flexible riser hull shuttle tanker reservoir reduction water depth subsea well floating production system upstream oil & gas Barusco , Pedro , "The Accident...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2019
Paper Number: OTC-29633-MS
... of which the features are patent pending. The design features are highlighted, then the specifics of combining topsides with hull are presented, followed by the installation particulars. Finally, perspectives and savings in using this solution are presented. Introduction Producing LNG offshore brings some...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2019
Paper Number: OTC-29226-MS
... and Systems for Power Utility Automation IEC PAS 63131 – System Control Diagram control architecture requirement sensor architecture operator topsides communication protocol interface protocol digitalization communication offshore technology conference subsea system subsea control...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2019
Paper Number: OTC-29410-MS
... Abstract The Aasta Hansteen Field development in 1300m water depth is the deepest field on the Norwegian Continental Shelf (NCS) and is developed using a Truss Spar FPSO. The platform was made ready with platform mooring chains after which Topsides were installed by float-over method in a fjord...
Proceedings Papers

Paper presented at the Offshore Technology Conference, May 6–9, 2019
Paper Number: OTC-29555-MS
... regulations. The platform was made ready with platform mooring chain and topsides installed by floatover in a fjord before being towed vertically to the field. floating production system hard tank spar hull riser tank condensate tank spar upstream oil & gas subsea system fpso access shaft...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2018
Paper Number: OTC-28803-MS
... The Hebron platform was successfully installed on the Grand Banks (Offshore Newfoundland and Labrador) in June 2017 with first oil produced in November 2017. It consists of a single shaft concrete Gravity Based Structure (GBS) supporting an integrated drilling and production topsides...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2018
Paper Number: OTC-28919-MS
... or additional equipment, avoiding alternatives that involved considerable cost and time for deployment. remediation option flowline blockage communication injection orange flowline wax inhibition asphaltene remediation green flowline topsides hydrate inhibition asphaltene inhibition sample...
Proceedings Papers

Paper presented at the Offshore Technology Conference, April 30–May 3, 2018
Paper Number: OTC-28970-MS
... breakeven cost floating production system topsides fpso gom building block water depth reservoir subsea system flexibility universal field development approach standardization universal field development solution host platform deepwater project Energizing Worldwide Oil and Gas...

Product(s) added to cart

Close Modal