Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Peer Reviewed
Format
Subjects
Journal
Article Type
Date
Availability
1-20 of 70
Keywords: installation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 37 (01): 17–32.
Paper Number: SPE-205016-PA
Published: 16 February 2022
... phases is degraded. Over the last few years, low-shear valves targeting petroleum processes have emerged on the market. This paper presents four separate live-fluid experiences from low-shear valve installations, each surveyed and documented by an independent third party. Three of the installations refer...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 37 (01): 151–158.
Paper Number: SPE-206270-PA
Published: 16 February 2022
... in California, USA. The panel on the left shows the heating before the supersonic nozzles were installed, and the panel on the right shows the heating 6 months after the installation of the nozzles. It is shown that the steam conformance was greatly enhanced for both wells after the installation. The economics...
Journal Articles
Ricardo S. Fraga, Octavio G. S. Castellões, Benno W. Assmann, Valdir Estevam, Greco T. de Moura, Ismael N. Schröer, Luiz G. do Amaral
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 35 (02): 454–463.
Paper Number: SPE-200497-PA
Published: 14 May 2020
... (Lochman and Bryce 1980 ; Yu 1995 ) and adapted for pumping multiphase mixtures from oil‐producing reservoirs. The pilot installation of this technology occurred in an onshore field, located northeast of Brazil. There is a brief description about some specificities of the progressive vortex pump (including...
Journal Articles
Clemens Langbauer, Manuel Hartl, Sergej Gall, Lukas Volker, Christian Decker, Lukas Koller, Stefan Hönig
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 35 (02): 406–421.
Paper Number: SPE-200478-PA
Published: 14 May 2020
... efficiency downhole desander beam pumping plunger speed grain size distribution sand by-production sand separation efficiency desander gas anchor installation in-house downhole desander separation performance sand tube Upstream Oil & Gas downhole desander installation SPE Production pump...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 35 (02): 422–434.
Paper Number: SPE-196592-PA
Published: 14 May 2020
..., optimum time, and conditions to install AL during the life of a well. This report presents a comprehensive review of AL system application with specific focus on tight oil and gas formations across the world. The review focuses on over 35 successful and unsuccessful field tests in the unconventional...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 35 (01): 018–025.
Paper Number: SPE-190923-PA
Published: 17 February 2020
...C. N. Hardegree; B. A. Gerrard; S. L. Wildman; K. S. McKenzie Summary In this paper we highlight a pilot project in which chamber gas lift was installed in two unconventional horizontal wells. Chamber gas lift, a combination of deep gas lift and intermittent gas lift, allows for an efficient...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 34 (02): 385–393.
Paper Number: SPE-192177-PA
Published: 31 December 2018
..., Society of Petroleum Engineers frequency ac frequency torque voltage artificial lift system Efficiency Exhibition operation stator Upstream Oil & Gas magnetic pole deployment application ims installation SPE Production esp PMM rotor magnetic field power factor ESP application...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 33 (03): 449–458.
Paper Number: SPE-182760-PA
Published: 14 February 2018
... to simulate a 10-year service life. Prototype components were designed, fabricated, and tested. These components were integrated and subjected to a rigorous system-integration test. After the comprehensive factory tests, a field-prototype system was built and installed in an offshore well. The system has been...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 33 (01): 60–67.
Paper Number: SPE-171368-PA
Published: 14 February 2018
... Production interaction ph assumption cph model University stratification assumption informatively installation Bailey This paper follows the life of a specific ESP motor (Series 562), serial No. #783039 (from here onward denoted as M ). We track its use through its operational lifetime...
Journal Articles
Takaaki Uetani, Naoto Furuichi, Hirokazu Yorozu, Kazuyo Sasaya, Takehiro Shibuya, Narihito Kiminami, Hideharu Yonebayashi
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 33 (02): 300–312.
Paper Number: SPE-182411-PA
Published: 02 November 2017
... since the start of production, this is not considered as the root cause of emulsion formation because the water cut remained unchanged at approximately 5.5% after the jet-pump installation. The fluid properties of oil and water from this well are summarized in Tables 3 and 4 . Table 3...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 32 (04): 527–538.
Paper Number: SPE-181235-PA
Published: 19 May 2017
... and considerable installation/deployment costs because a workover rig is typically required for intervention. Unfavorable producing conditions and tortuous wellbore trajectories tend to further decrease run lives. These issues can make economical hydrocarbon production impossible. The SRVP was developed...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 32 (02): 159–167.
Paper Number: SPE-181773-PA
Published: 12 January 2017
...William G. Elmer; David C. Elmer Summary Opportunities to improve the standard three-stage wellhead gas lift compressor design for application to unconventional shale reservoirs are presented. A two-stage design is presented, with two field installations in the Eagle Ford Shale reviewed as a case...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 29 (03): 155–161.
Paper Number: SPE-166208-PA
Published: 15 May 2014
... of a self-installing platform (SIP). The platform is currently the largest of its kind in the world at 133 m high, being slightly heavier than the Eiffel Tower and designed for future reuse at another location for the purpose of producing some other small accumulation. The platform was installed...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 25 (01): 125–131.
Paper Number: SPE-130489-PA
Published: 16 February 2010
...Abisoye Babajide; Jim Hall; Johnnie Garrett Summary When oil wells can no longer flow naturally at the desired rate, artificial-lift methods are often employed. Most mechanical installations of artificial-lift equipment require a complete workover of the well, involving pulling the well apart...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 23 (04): 427–430.
Paper Number: SPE-120744-PA
Published: 15 November 2008
... installations in Increment-2 were part of a proof-of-concept project to test and evaluate the impact of these technologies on reservoir and well performance and on overall reservoir-management strategies. As a result of the proof-of-concept project, Increment-3 was developed with MRC/ ML wells with SCs...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 23 (03): 392–403.
Paper Number: SPE-107374-PA
Published: 14 August 2008
.../cm 2 (1.47×10 6 Pa). The first stage of a major gas compression project began approximately 6 years ago. During the last 4 years, a second stage has been initiated, and the third phase will be finished by 2007. By then, Repsol-YPF will have installed 67 compressors in the field, including new...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 23 (02): 287–296.
Paper Number: SPE-102854-PA
Published: 19 May 2008
.... Another aspect of oil-water separation investigated was the effect of processing equipment and vessel retrofitting. These included the conversion of two-phase (gas/liquid) separators into three-phase (gas/oil/water) separators, installation of coalescer packs, demulsifier injection strategies, and use...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 22 (02): 176–189.
Paper Number: SPE-95843-PA
Published: 19 May 2007
...B. Sandøy; T. Tjomsland; D. T. Barton; G. H. Daae; E. S. Johansen; G. Vold Summary A four-zone intelligent water-alternating-gas (WAG) injector was installed at the Statoil Veslefrikk Field in the North Sea in May 2004. The completion includes one on/off and three variable downhole chokes...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 22 (01): 20–40.
Paper Number: SPE-96619-PA
Published: 19 February 2007
... normal surface-facility flowing conditions, and for this reason, a dump valve (which is actuated by a liquid-level sensor) is installed in most separators to maintain a gas/liquid interface within an appropriate operating range. In the wellbore, it is not customary to control the liquid level...
Journal Articles
Journal:
SPE Production & Operations
Publisher: Society of Petroleum Engineers (SPE)
SPE Prod & Oper 21 (03): 388–393.
Paper Number: SPE-90024-PA
Published: 19 August 2006
... Production well surveillance differential pressure slip model spe annual technical conference accumulation installation holdup Mixture density schlumberger august 2006 permanent downhole multiphase flowmeter Well monitoring, surveillance, and problem diagnosis are critical parts...
1