1-20 of 48
Keywords: BHA
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215251-MS
... government drilling fluid management & disposal drilling fluid polyamine cuttings inhibition presented requirement bha wellbore stability offshore vietnam sg htp programme versatile hthp water-based drilling fluid hpp Introduction At the planning stage for the campaign discussed...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215391-MS
... drilling (DD), casing while drilling (CWD), underreaming service, loss circulation management tool service, drill bit performance service, and many others. In a complex drilling bottom hole assembly (BHA) deployment, multiple skilled-personnel presences at the rig site are required which consequently...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210624-MS
... taken to minimize the drilling risks and optimize the drilling operation In terms of drilling assembly, including bit and Bottom Hole Assembly (BHA), enhanced design was selected based on the lesson learned from previous campaigns. The bit equipped with durability proven conical diamond element...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205775-MS
... well intervention ct string ct reach ct intervention friction coefficient target depth friction reducer hydraulic tractor bha string design telemetry Introduction The giant oilfield "A" development strategy aims at maximum reservoir contact (MRC) by drilling extended reach wells. MRC...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205565-MS
... intervention intervención de pozos petroleros completion installation and operations drilling operation upstream oil & gas bha well integrity contribution oil production xpandable steel patch zonal isolation coiled tubing operations production enhancement patch installation packer...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205804-MS
... (BHA) and the wellbore, interaction of a drilling bit and a formation, drilling hydraulic etc. Specific downhole conditions, as partial or complete losses, hard layers etc. may further affect the drilling dynamic and make it more challenging to reach the efficient drilling. The downhole dynamic...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202265-MS
... for reservoir mapping while drilling in high-angle and horizontal wells and allows for routine landing applications ( Beer et al., 2010 ). It consists of a transmitter and multiple receivers placed in the bottom hole assembly (BHA) with multiple frequency selection. Depth of detection ahead of the bit (DODLA...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202251-MS
... Drilling Challenges & Solutions The borehole trajectory and bottom hole assembly (BHA) design decisions made during the planning stage for the B15 and B16 wells were driven by: directional drilling and ECD constraints; collision avoidance; hole cleaning requirements; completion...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202342-MS
..., the higher the amplitude range needs to be to prevent clipping. Several downhole tools used in the study are able to capture HFTO in the BHA within the specifications discussed above, notably a rotary steerable system that is able to provide tangential acceleration measurements in real-time and an in-bit...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202414-MS
... indonesia bha section milling operation upstream oil & gas communication milling operation well information Introduction The Arun Field is a giant gas field in North Aceh, Nangroe Aceh Darussalam (NAD) Province and has been contributing towards LNG sales for the Asian market since 1978...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202441-MS
...-sectional cement plug is installed using a specialized Bottom Hole Assembly (BHA). The goal is to maximize the cement plug quality through optimizing the BHA and operational process parameters within constraints imposed by the operating conditions. This paper describes application of Computational Fluid...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202431-MS
... modelling the bottomhole assembly (BHA) directional behavior. This paper aims to present a methodology that allows the anticipation of problems such as mechanically stuck pipe or lock up situations when running in hole casing or completion strings.The methodology consists of 3 tasks: evaluation...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202397-MS
... Starting from bottom, the BHA has a threaded bullnose which allows combined trips (TCP, plugs, other). Above it is a wash tool with 30 nozzle positions. BHA body OD is selected based on casing size/weight, but it is generally drift minus 0.5 inches. Above the wash tool is a cement tool which...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196481-MS
... bit design cutter Upstream Oil & Gas drilling performance Drill Bit Technology ROP bit selection motor bha application PDC vibration dual chamfer cutter hybrid bit breakthrough drilling performance BHA torsional vibration Drilling hybrid drill bit technology penetration...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196533-MS
... Two offset appraisal wells were analyzed. Summary of performance per section can be seen below: 17 1/2″ Section: The 17 ½″ section is the longest and the most challenging section as seen in previous experiences. There were numerous issues experienced during drilling. The bit and BHA...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196550-MS
.... The detailed planning conducted to finalize the drilling bottom hole assembly (BHA), perforating gun performance, drill pipe cutter, production rate impact, erosional and corrosion impact of using drill pipe as completion will be explained in the paper. Operationally, after the well was drilled to TD, 1-11/16...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196315-MS
... design. The drilling objectives were to reduce and separate the risks in the different sections and to drill the gas cap formation in the 12.25-in. shale section, plus landing the well with possible fluid losses while entering the reservoir with the 8.5-in. bottomhole assembly (BHA). This drilling plan...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196283-MS
... of 181 days. The objective was to optimize the well design, bottomhole assemblies (BHAs), and casing points to optimize drilling operations and reduce costs. Due to the 17.5-in. and 12.25-in. sections being drilled vertical, the main optimization focus of the project began in the 8.375-in. buildup...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196410-MS
... during drilling operations. Drilling parameter results are compared with offset well that had high stick slip. The approach was based on qualitative research method, data processing obtained from the drilling operation of the well X. The method was performed by evaluating the use of FRS in the BHA...

Product(s) added to cart

Close Modal