1-20 of 24
Keywords: bridge plug
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205674-MS
... production logging production enhancement water source mmscfd perforation batch coiled tubing mahakam field water production bridge plug retrievable plug limitation production control downhole intervention well intervention gas production multilayer tubingless well water shut-off mwso...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202354-MS
... important now than ever to abandon wells properly and permanently the first time. Given the limitations of cement, bridge plugs and resins, a more reliable plugging material has been needed for years and now there is one, bismuth and thermite. This paper was selected for presentation by an SPE...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202319-MS
... and performance. Ant-tracking-based workflows and borehole image data are regularly used to optimize completion campaigns, but bridge-plug-stuck and screen-out risks are still high. The lack of sufficient understanding and accurate identification of the natural fracture systems are the major challenges to address...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196503-MS
... al. 2011 ) was performed after a bridge plug was set at 1460m. The hesitation squeeze scenario was applied during the first part of the water injectivity test and pump up was performed to 100psi, 200psi, 500psi, 700psi, and 1000psi, respectively. The pressure drop was monitored at each stage...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196266-MS
... zonal isolation well integrity pilot job production enhancement bridge plug downhole intervention Upstream Oil & Gas Well Intervention well integrity assurance methodology Barrier Verification System sequence installation profile Signature transmitter society of petroleum...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186184-MS
...; dissolvable plug and dissolvable frac ball that are used in multistage stimulations. Dissolvable bridge plugs and frac balls are now available, meaning there will be no need to drill out the bridge plug or frac balls. This is different than a composite bridge plug and can provide substantial savings in time...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 25–27, 2016
Paper Number: SPE-182451-MS
... Noise level bridge plug hydraulic fracturing isolation leak isolation detection degradable diverter diverter composite pill fracture acquisition system completion installation and operations Leak HFPM wellbore real-time interpretation operation interpretation multistage operation...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 22–24, 2012
Paper Number: SPE-158747-MS
... of water cut of 60%. The well was still unstable in terms of rate due to high water cut. The well was considered for rigless work-over to control the water using Mechanical Through Tubing Bridge Plugs (MTTBP) to isolate the lower two perforation sections. After setting the Bridge Plug with 8 ft. of cement...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 22–24, 2012
Paper Number: SPE-158520-MS
... completion installation and operations bridge plug inflatable bridge plug plug isolation tool string mmscfd spe 158520 society of petroleum engineers carbonate formation upstream oil & gas cement zonal isolation bailer ujung pangkah field drawdown dump bailer lower packer...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, September 20–22, 2011
Paper Number: SPE-145876-MS
... To address this situation a large diameter inflatable packer has been developed which can seal in a wide range of casing sizes and can be equipped to act as a bridge plug and hold pressure from below, making it an ideal solution to the problem of temporary plug and abandonment of wells in areas...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, September 20–22, 2011
Paper Number: SPE-147765-MS
... in the region is bullheading, with some version of aretrievable bridge plug used as a bottom isolator. However, this method does not provide isolation of the productive zones situated above. All the applications were limited to treat the uppermost reservoirs in the wells, or sometimes to sacrifice and to seal...
Proceedings Papers

Paper presented at the Asia Pacific Oil and Gas Conference & Exhibition, August 4–6, 2009
Paper Number: SPE-121182-MS
... Abstract This case history describes a procedure in which a polymer sealant and a bridge plug were used to shut off water production from upper zones to enable gas production from productive lower zones. Offshore gas fields operated in East Kalimantan were producing gas and water. When water...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, September 11–13, 2006
Paper Number: SPE-100744-MS
... in this report is the incremental revenue generated by eight additional days of early production achieved by completing the project ahead of schedule. downhole intervention artificial lift system gas lift bridge plug Well Intervention Upstream Oil & Gas Completion Installation and Operations...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, September 11–13, 2006
Paper Number: SPE-100771-MS
... campaigns in the North Sea region UK sector. A discussion of the methodology, materials and techniques used. well decommissioning North Sea cement plug Cement System well abandonment status Upstream Oil & Gas bridge plug mechanical plug plug abandonment platform cement prevention...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2004
Paper Number: SPE-88615-MS
... configuration that works within current lubricator restrictions, but is capable of setting repeatedly as a retrievable bridge plug and treating packer combination. This allows longer zones to be precisely isolated multiple times in a single trip in hole. This innovative technique can not only reduce...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, September 9–11, 2003
Paper Number: SPE-80477-MS
... junction area drilling operation consideration completion installation and operations conference spe 80477 requirement reservoir construction bridge plug mainbore completion sandstone reservoir Introduction Multilateral completion methods are typically open hole and horizontal...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 16–18, 2000
Paper Number: SPE-64394-MS
... packer gas well reservoir spe 64394 permeability bambang ismanto completion installation and operations internal diameter monobore reservoir pressure bridge plug casing and cementing fluid dynamics lng production enhancement asset and portfolio management well intervention downhole...

Product(s) added to cart

Close Modal