Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-7 of 7
Keywords: cement packer
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Muhammad Abdulhadi, Evelyn Ling, Ahmad Uzair Zubbir, Hani Mohd Said, Rohani Elias, Paul Sanchez, Nazri Nor, Rizam Sharif, Nurhanim Ismail, Yoong Hau Kew, Zamri Abdul Ghapor, Abdul Malek Ismail
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205666-MS
... Abstract The Cement Packer approach has been successfully implemented in ExxonMobil Exploration & Production Malaysia Inc. (EMEPMI) to further develop minor gas reservoirs. The reservoir of interest is of relatively poor quality and has not been tested, thus making conventional development...
Proceedings Papers
Ahmad Uzair Zubbir, Hani Mohd Said, Muhammad Abdulhadi, Evelyn Ling, Paul Sanchez, Nazri Nor, Nurhanim Ismail, Abdul Malek Ismail
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205719-MS
... Abstract Cement Packer is a cost-effective alternative to workover for monetizing hydrocarbon reservoirs above the well top packer. While conventional cement packer utilizes coil tubing for cement placement, an innovative and more cost-effective approach was successfully implemented with only...
Proceedings Papers
Fedriando Fedriando, Aldy Reza Pambudi, Donna Sita Rolanda, Citra Srikandi, Agung Prasetyo Nugroho, Ahmad Arif Fadhlirrahman, Addil AD, Tedi Satria
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196417-MS
... Upstream Oil & Gas well logging log analysis correlation wet zone unprognosed zone completion mmscfd potential zone hydrocarbon mud log data nilam production dual selective completion sanga-sanga block Nilam field well review Indonesia cement packer spe asia pacific oil and gas...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Asia Pacific Oil and Gas Conference & Exhibition, August 4–6, 2009
Paper Number: SPE-123773-MS
... these potentials is not economically viable due to significant cost and complexity. An innovative, rigless "cement packer" approach, had been chosen for the pilot job in Well # A, while retaining necessary level of completion integrity. The proper placement of cement packer approach involves usage of hydrostatic...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the Asia Pacific Oil and Gas Conference and Exhibition, October 30–November 1, 2007
Paper Number: SPE-108973-MS
...Cement-Packer Implementation Temporary Isolation of a Lower Completion In certain cases it may be desirable to retain the production potential from one or more of the strings, below the cement-packer potential. In these cases, appropriate and temporary isolation of these zones can be made...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 8–10, 2002
Paper Number: SPE-77804-MS
... Finally, the cement packer should be pressure tested from the surface on the tubing-casing annulus or down the tubing. The test pressure should be equivalent to the maximum expected differential from gas lift, stimulation or production conditions. Accessing Target Reservoir Once the cement...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference, October 28–31, 1996
Paper Number: SPE-36963-MS
... vincensius soetedja cement packer spe 36963 plug badak coiled tubing bridge plug short string perforation packer hunter spe 36963 gravel pack workover cement penetration upstream oil & gas reservoir long string completion installation and operations drilling fluid...