Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 276
Keywords: completion
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Umair Ahmed Baig, Mohammad Ali Al Mohammad, Ahmad Othman Alshaigy, Mohamed Abu Aisha, Ahmed Abdulla Al Mutawa
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221143-MS
... Abstract This paper provides a comprehensive overview of the TAML Level 2 multi-lateral well by the Field Operator, which features a permanent limited entry liner completion in both laterals to enhance the reservoir productivity. The well marks a significant technical achievement...
Proceedings Papers
Moataz Mohamed Fahmy Elzeky, Esha Narendra Varma, Mahmoud Elhusseiny, Mohamed Anwar, Eisa Daban Al Shamisi, Ibrahim Hamdy
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221207-MS
... corner, optimizing the materials/services and applying the lessons learned from each section, improving the operations well by well. The wells were completed with 30% improvement of well performance. Applying Batch drilling technique in Unconventional Pad wells has had great savings up to 13% of cost...
Proceedings Papers
Asyikin Mat Deris Nurul, Effie Mohd Farid Woo Mohd, Ng Natasya, Siew Jia Lih Caleb, Annuar Nordin Khairul, Al-Fatlawi Ahmed, Hillis Frazer, Mohd Ismail Ismarullizam, Bakar Hasmizah, Maznur Mazlan Eliff, M Firdaus Hapidz
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221191-MS
... of proactive measures to anticipate and address potential challenges associated with new technology adoption. The AICV completion integrates essential components such as sand screens and swell packers. Sand screens not only regulate sand production but also uphold AICV integrity throughout the well's lifespan...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221325-MS
... retention mechanism in oil and gas wells through a coupled CFD-DEM approach and innovative laboratory experiments. The motivation stems from the economic impact of sand production, where standalone screens serve as cost-effective alternatives to gravel-pack completions. However, existing selection criteria...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221336-MS
.... These stalks are then spooled on to a dedicated reeling vessel equipped with a large reel and supporting tensioning system. On completion of the reeling, the installation vessel transits to the field where the pipeline is slowly unspooled from the reel, guided over an aligner and through a lay tower, where...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221123-MS
... wells/year to meet the aggressive production target of ∼1.5 MMBOPD. One of the biggest challenge the asset is facing is to Drilling-Complete-Connect all these upcoming wells in the multi-layered reservoirs of GB, having surface limitations due to existing production and injection infrastructure...
Proceedings Papers
M. Azhari, F. Rozi, F. Fedriando, D. E. Marandityo, P. A. Merati, R. Oktaheptavia, A. E. Naibaho, D. Halinda, T. Purwoko
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221161-MS
... Abstract The Sanga-Sanga field in East Kalimantan, Indonesia, has been producing oil and gas for over 40 years and has reached a mature stage. Efforts to sustain production decline have been made by applying dual monobore completion since the early 2000s. This approach accelerates production...
Proceedings Papers
Mohamed Omar Awad, Abdulaziz Ali Sajer, Anood Mohammad Qamber, Hamdi Saber Ibrahim, Fernando Robles, Quek Khang Song
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215382-MS
... formation in North Kuwait fields. Nevertheless, more studies was conducted to optimize the fracturing and completion design to improve well productivity as well as uniform production profile through well bore. Multi stage fracturing in open hole was the common technique since new development plan started...
Proceedings Papers
Harris Pramana, Cio Cio Mario, Anang Nugrahanto, Arief Lukman Hakim, Ameria Eviany, Anom Seto Murtani
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215394-MS
... Block off the northeastern coast of Java Island has been discovered in 1998 and carries on production since 2007. Having a typical gas cap with an oil rim, carbonate reservoir; Ujung Pangkah field has since been developed with commingle completion targeting both separated layers of oil zone and gas zone...
Proceedings Papers
Tao Xie, Xinxin Hou, Hongbo Huo, Hai Lin, Ruibing He, Dongsheng Xu, Lei Zhang, Hailong Liu, Wenlong Li, Xun Liu
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215427-MS
.... The data acquisition standard of offshore drilling and completion is formed, and the data are transformed and stored in database system. Based on the analysis of regional geological, seismic, logging and drilling data, various risks of the design well are evaluated to achieve the best drilling...
Proceedings Papers
Deepak Gunwant, Nand Kishore, Ranjit Gogoi, Sagun Devshali, Kuldeep Laxmanbhai Chanchalni, Himanshu Kumar Rajak, Sunil Kumar Meena
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215481-MS
... in their fields. upstream oil & gas port efficiency well valve artificial lift system qtotal operation tubing head pressure gas lift multiple converging gas lift port glv mcglp asia government pressure reduction completion Introduction Gas Lift is a commonly deployed artificial...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210608-MS
... geomechanics installation drawdown maximizing learning downhole sand control probability gravel completion permeability sand control reservoir characterization operation injectivity mechanism petroleum engineer chfp workflow Introduction L-B is a marginal deepwater field (~900-1200m...
Proceedings Papers
Edwin Siahaan, Irwan Mamat, Senna Sun Laksana, Agung Setyowibowo, Aulia Ahmad Naufal, Octy Edriana Wulandari, Sabrina Metra, Ardi Karta Nainggolan, Okky Idelian Arinandy, Livia Ellen, Maharani Devira Pramita, Agnes Tjiong, Yus Wilian, Praprut Songchitruksa
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210614-MS
... in this solution's flow. The main components for WEPON includes: 1. Technical analysis with analytics and ML plus multi-criteria decision-making process to identify high potential completions, both produced and virgin ones 2. Adopting from the field's old workflow, feasibility checks to surface and subsurface...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210776-MS
... Sand production prediction is essential from the early stages of field development planning for completion design and later for production management. Unconsolidated and weakly consolidated sandstones are prone to fail at low flowing bottom hole pressures during hydrocarbon production. To predict...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210748-MS
... utilization cuttings transport operation pilot recycled drill one-time epa 3051 aerial photograph completion Introduction Drill cuttings are pieces of rocks that are generated when holes are drilled through the earth's crust to reach the oil and gas reservoir. During drilling operations...
Proceedings Papers
Nurul Amali Kadir, Saikat Das, Jittbodee Khunthongkeaw, Jamal Dayem, Ashraf Abdul-Hamid, Shaherol Hassan, Nurdiyana Noridin
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205655-MS
..., the parameters were again reduced to carefully cutting through control line. The tubing was successfully retrieved with smooth cut without any over pull indicating it to be completely free. The flawless cutting operation was performed in less than one hour with outmost efficiency. In another highly inclined...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205612-MS
...Architecture Simplification with One Phase Completions In order to optimize the well architecture, one phase well only utilize diverter, since OPW well drilling with reservoir section from beginning to TD. Since diverter in OPW will be utilize from beginning to TD kick margin are ignore...
Proceedings Papers
Chih-Cheng Lin, Andrew G. Tallin, Xueyong Guan, Jiten D. Kaura, Sasha F. Luces, Sara Shayegi, Kenneth W. Oyler, Ronald A. Reutzel, Michael LaPointe, Michael Teoh, Terry T. Palisch, George K. Wong
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205771-MS
... for several reasons. It enabled conventional gravel pack pumping operations and equipment and it accommodated the brine weight needed to inhibit the shales. A series of lab tests showed that the completion fluid density required to inhibit the reservoir shale reactivity was only possible using CML. An overall...
Proceedings Papers
Zaidi Awang@Mohamed, Jagaan Selladurai, Siti Nur Mahirah Mohd Zain, Juhari Yang, Badroel Rizwan Bahar, Abdel Ben Amara, Joel Shaw, Gerry Patterson, Stephne Fauz
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205763-MS
... Abstract Objectives/Scope This paper describes a pilot installation of a digital intelligent artificial lift (DIAL) gas lift production optimization system. The work was inspired by PETRONAS' upstream digitalization strategy with five single and dual-string gas lift completions planned from...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205762-MS
... standpoint. The minimum requirement for abandonment of the South Australian wells is governed by Objective 6 Cooper Basin State Environmental Objectives (SEO): Drilling, Completions and Well Operations, November 2015 guidelines, which provides the compliance criteria for appropriate barrier installation...
1