1-20 of 255
Keywords: completion
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215382-MS
... formation in North Kuwait fields. Nevertheless, more studies was conducted to optimize the fracturing and completion design to improve well productivity as well as uniform production profile through well bore. Multi stage fracturing in open hole was the common technique since new development plan started...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215394-MS
... Block off the northeastern coast of Java Island has been discovered in 1998 and carries on production since 2007. Having a typical gas cap with an oil rim, carbonate reservoir; Ujung Pangkah field has since been developed with commingle completion targeting both separated layers of oil zone and gas zone...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215481-MS
... asia government pressure reduction completion upstream oil & gas port efficiency well Introduction Gas Lift is a commonly deployed artificial lift technique in the oil and gas industry. It utilizes highpressure natural gas injected into the casing-tubing annulus to assist in lifting...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215427-MS
.... The data acquisition standard of offshore drilling and completion is formed, and the data are transformed and stored in database system. Based on the analysis of regional geological, seismic, logging and drilling data, various risks of the design well are evaluated to achieve the best drilling...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205780-MS
... accumulation time completion gas injection duration liquid column gas lift cylinder maximizing production crude oil intermitter graph artificial lift system head pressure optimized value fluid column determination tangent equation operating gas lift valve accumulation time Gas Lift...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205762-MS
... by Objective 6 Cooper Basin State Environmental Objectives (SEO): Drilling, Completions and Well Operations, November 2015 guidelines, which provides the compliance criteria for appropriate barrier installation and verification. Well complexity is determined by the difficulty in achieving this minimum...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205763-MS
...Application Well DL-AX is a highly deviated well drilled and completed in the DL field offshore Malaysia in May 2020. It was completed with 7″ casing and 3-1/2″ tubing, and with a maximum deviation of 80 degrees. A gas lift design was performed and required three gas lift stations...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205601-MS
... correlation reservoir property gas field technology conference complex reservoir completion information flowback ratio service supplier water production inconsistency data approach dataset Introduction Abstract The economics of tight gas fields highly depend on the consistency between...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205612-MS
... carried out. Until now, the OPW architecture has become one of the common architecture used in drilling operations as an optimization effort. Until December 2020 PHM has completed 15+ OPW wells. A general comparison of OPW and SLA well is at the cost of constructing a well of approximately 200,000...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202296-MS
... Abstract Openhole gravel pack is the preferred completion method of sand control in unconsolidated deepwater formations with sanding tendencies. The design phase of an openhole gravel pack treatment spans drilling of the reservoir section, wellbore preparation, sand screen installation, gravel...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202431-MS
... modelling the bottomhole assembly (BHA) directional behavior. This paper aims to present a methodology that allows the anticipation of problems such as mechanically stuck pipe or lock up situations when running in hole casing or completion strings.The methodology consists of 3 tasks: evaluation...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196477-MS
... Abstract This paper describes a dynamic modelling and optimization study to investigate the viability of deploying intelligent completions for well management in a mature oilfield in order to mitigate the challenges of increasing water cut and rapid diminishing of surface locations for new...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196560-MS
... Completion Installation and Operations Efficiency benchmarking completion equipment category PAC performance indicator completion minimum standard optimization MPM strategic planning and management Upstream Oil & Gas completion completion cost application operator Malaysia...

Product(s) added to cart

Close Modal