Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-2 of 2
Keywords: electric line
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
A Comparative Review of Production Logging Techniques in Open Hole Extended Reach Wells
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202298-MS
... is taken while designing the logging operation. The choices available to deploy the logging tools are mainly on electric-line cable with an electric powered tractor or on coil tubing with a hydraulically powered tractor. The most common type of log performed in these extended reach wells is a production...
Proceedings Papers
Innovative Through-Tubing Cement Packer Technique
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 8–10, 2002
Paper Number: SPE-77804-MS
... in the 9-5/8" casing on electric line with at least 18-20 ft of cement dump bailed on top to abandon the existing perforations. In addition, the tubing punch interval would be 5 ft with two shots per foot. Well No. 3 The target completion zone in Well No. 3 was above, below and across the existing...