Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-7 of 7
Keywords: gas lift valve
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Proceedings Papers
Farasdaq Muchibbus Sajjad, Alvin Wirawan, Savinatun Naja, Wingky Suganda, Harris Pramana, Axel Perwira Indro, Steven Chandra
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196534-MS
... is found out to be not optimum. Many unloaders at the upper part of the completion aren't necessary during its production stage and usually will be changed into a dummy valve during gas lift valve redesign (GLVR) operation. These excessive number of valves may cause many problems, such as limited gas...
Proceedings Papers
Farasdaq Muchibbus Sajjad, Khairullah Sastradinata, Silvya Dewi Rahmawati, Achmad Mansur, Alvin Wirawan, Ecep Mujib
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196392-MS
... problem effectively in Offshore North West Java field. artificial lift system long string gas lift valve Upstream Oil & Gas completion application equilibrium factor gas injection PPO valve performance curve Orifice Injection Rate production pressure allocation factor valve gas...
Proceedings Papers
Jing Zhi Kueh, Jit Sen Lim, Rick Raynold Claudius, Chii Seen Huong, Daevin Dev, Mohana Ramanee Thamilarasu, Nurul Syafiqa Abdul Wahab, Hazlina Hashim
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196483-MS
... Artificial Intelligence Upstream Oil & Gas co 2 gas injection return signature high deviation well well deviation optimization mandrel valve orifice valve well lifting optimization problem gas lift operation gas lift valve tracer survey society of petroleum engineers Introduction...
Proceedings Papers
Claire Li Chang, Oliver Spenger, Amierul Amran, M Idraki M Khalil, M Hafizi M Ariffin, Dinesh Balakrishnan
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196508-MS
... on a live well, which further reduces possibility of damaging formation during stimulation due to secondary chemical reactions. UST was piloted on 2 wells in Field T: Well X and Y. Well X showed an initial 30% gain post stimulation. Well Y was showing signs of clogged gas lift valves. Post operation...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 20–22, 2015
Paper Number: SPE-176291-MS
... and allowed approximately 24,000 bbls of oil to be produced while waiting for the ESP to be serviced or replaced. However, the previous hybrid design used just a single gas lift valve as an unloader and injection point. Performance analysis of the previous design showed that the gas lift performance could...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, April 5–7, 2005
Paper Number: SPE-93848-MS
... temana field insert string technique idle well diagram application gas lift reservoir pressure gas lift valve liquid level insert string installation quit production upstream oil & gas mandrel low liquid level schematic diagram insert string production monitoring gas...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 8–10, 2002
Paper Number: SPE-77804-MS
..., a treating pressure of 4000 psi was required to breakdown the perforations. Again, no communication was observed across the cement packer. After the acid stimulation, the dummy valves were replaced with gas lift valves without encountering any problems. The lower zone was tested for several days...