Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 156
Keywords: installation
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Roberto Fuenmayor, Hugo Quevedo, Christian Bonilla, Jorge Yánez, Santiago Dávalos, Galo Calvache, Johanna Moya, Erick Jácome, Iván Osma, Raquel Correa, Willem Sepúlveda, Juan Pablo Gallardo, Fabian Florez, Ali Didanloo, Boris Zolnikov, Xavier Chicango, Geovanny Ramos, Wilson Guillén, Ximena Córdova, Ernesto Bedón, Danilo García, Manuel Muslera, Diego Estevez, Jose Somale, Alexander Pineda
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221158-MS
... The installed system was modified to update acquired data, including pressures, temperatures, inverter speed, etc., to conforms to the necessary structure for data management. The system server was linked to the SCADA system through programming and physical connections, including a fiber optic...
Proceedings Papers
Partha Protim Maut, Yerra Prakash, Udai Anand Dutta, Partha Protim Saikia, N M Sowmyanarayanan, Abhishek Yadav
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221173-MS
...Surface equipment Controller Motor valve Lubricator with appropriate internals Plunger catcher Arrival sensor artificial lift system gas lift well lift installation pagl system plunger lift system gas well production gain surface pressure chart gas lift...
Proceedings Papers
Moataz Mohamed Fahmy Elzeky, Esha Narendra Varma, Mahmoud Elhusseiny, Mohamed Anwar, Eisa Daban Al Shamisi, Ibrahim Hamdy
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221207-MS
... in 3batches.This was achieved by spudding on well A and drilling and cementing the first section 16" Hole.The rig is then skid to well B to start drilling the first section again,meanwhile in well A is nipple down the Diverter,install wellhead section offline.This operation is repeated till well #10 in the last...
Proceedings Papers
Muhammad Rasyid Ridlah, Panji Ikhlasul Amal, Teguh Rachman Hidayat, Nadir Faisal Almadani, I. Pandu Wijaya, Andrei Lobanov, A. Maltsev, Nail Minniakhmetov
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221342-MS
... power consumption, ESP run life, and production sustainability. The parameters are presented for three different case studies which compare three production wells equipped with conventional asynchronous ESP motors (AM) and PPM motor. The campaign for PMM installation was started in 2019. Now, 40...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221336-MS
... Pipeline reeling is a common cost effective method frequently employed for the installation of offshore pipelines up to 0.5 metres in diameter. Individual lengths of pipe are fabricated into longer stalks lengths between one and three kilometers in length at a specialised onshore spool base...
Proceedings Papers
Dharshana Navaratnam, Eadie Azahar Rosland, M Fairuz Azman, Ivan Chee XianLung, Tham Kah Meng, Nur Hazrina Kamarul Zaman, Sarah Nabilah Ibrahim Kamal, Khiril Shahreza Salleh, M Shamir A Rahim, Zulkifli M Zin A, Ilangkabilan Manaharan, Bahrom Madon, Mohd Fadzli Hamidun
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215200-MS
... this, a pilot project was initiated, introducing the innovative Boron Diffused Erosion Resistant Through Tubing Sand Screen (ER TTSS) technology. The results obtained after installing this technology showed promising improvements in well performance. Boron diffused ER TTSS represents an advancement...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215237-MS
... environmental metocean and water depth range from 70 m – 100 m is limitation of crane barge for installation of offshore jacket platform. With metocean criteria and water depth in Natuna Sea, the minimum jacket weight using conventional design is about 1000 ton lifting weight, in 2019 during the Medco E&P...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215345-MS
... plan has been developed with the scope as follows; leaking point identification, remedial cementing which include the installation of additional 9-5/8″ as "suspended" tie back casing, and barrier verification test. This paper is describe the process to recover both surface and wellbore well integrity...
Proceedings Papers
Nirwanshah Nasharudin, Caleb Jia Lih Siew, Mohd Zulfadli Ibrahim, Euan Alexander, Eugene Bespalov, Nurul Aula A’akif Fadzil, Hasmizah Bakar
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215422-MS
... issues such as sand migration, gas handling, reservoir souring and scaling may also contribute to the system's inefficiency, which may result in system failure. Installing an ESP especially with an inverted pump does need an extensive monitoring capability be it downhole or on surface. Lack of essential...
Proceedings Papers
Harris Pramana, Cio Cio Mario, Anang Nugrahanto, Arief Lukman Hakim, Ameria Eviany, Anom Seto Murtani
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215394-MS
... in offshore conditions, these wells are using specialized, feed-through-ESP hydraulic packer that enables ESP cable and gas vent line to be passed through. To ensure these wells reach the economic limit of ESP installation, this hybrid completion design is used; utilizing ESP as the main artificial lift...
Proceedings Papers
Ashvin Avalani Chandrakant, Aqil Muhammad Yusof, Zulkifli M Zin, Eadie Azahar Rosland, Amrit Stefan Balgobin, Chung Li Ren, Charlie Alexander McClean
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215411-MS
... will discuss the performance of Malaysia's first installation of bonded bead sand screen in Well A. In contrast to conventional wire wrap or mesh filtration media, bonded bead sand screen incorporates tightly fused beads in cartridge form that act as depth filter to exclude sand, installed on a flushed...
Proceedings Papers
Yi Huang, Wen Bo Meng, Dong Lei Jiang, Xue Peng Wang, Hai Ning Chen, Jian Bo Su, Nigel Ruescher, Fei Xu, Huan Diao, Heng Wang, Tan Xiao, Ying Hao Wang, Yi Yu
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210735-MS
... equipment scssv operation upper completion system integrity deepwater gas field packer system execution operator south china sea installation seating nipple hydraulically assembly Deepwater subsea wet-tree completions differ from conventional dry-tree completions due to their unique...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210703-MS
...Transportation & Installation Engineering Main objectives for Transportation &Installation Engineering of the project are as follows: Abstract ZEEpod is a tripod-based structure that is designed for shallow water and could be the possible attractive solution for marginal fields...
Proceedings Papers
Sarah Nabilah Ibrahim Kamal, Zulkifli M. Zin, Nur Hazrina Kamarul Zaman, M. Shamir A. Rahim, Nur Afiqah Ayub, Fathin Shalihah Hasnol Zam
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210641-MS
... the screen opening size, screen length, location and conveyance method. Post-installation, the opening up of the well is in accordance with the bean up procedure to avoid sudden surge or high velocity flow that can damage the screen. In addition, acoustic sand monitoring and sand sampling were also performed...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210725-MS
... was quickly made safe by closing a primary barrier, the downhole surface-controlled subsea safety valve (SCSSSV), and installation of a secondary barrier in the form of plugs downhole. To bring production back, the root cause was investigated, and it was determined that the straight-bore metal-to-metal seal...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210697-MS
... leakage line. Various improvements and dry gas seal system modifications were carried out to cope with the dry gas seal failures, such as the installation of duplex seal gas strainer to allow strainer replacement without shutting down the compressor. Furthermore, the Electrical Heat Tracing (EHT...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210608-MS
... While some approaches are possible for shallow water and/or platform application, this might not be economically viable for deepwater or subsea operation. For example, well intervention to install through tubing sand control for subsea well can be very costly, while topside solid management might...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205529-MS
... adequate safety factors during installation. An optimum design requires partial foundation uplift during pile sequencing, while the areas in compression have an adequate margin of safety. A method has been developed to analyze any polygon foundation shape, which allows for uplift on any part of the mudmat...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205532-MS
... the requirements of a specific well to optimize its production. The jet pump has no moving parts and most of the time can be deployed rig-less, which drastically decreases the installation cost and time for the Operator, translated consequently to decrease the well's kick-off time to start flow. This lift system...
Proceedings Papers
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205554-MS
...), Fusible Plug loop installation only (instead of redundant protection using Flame Detector system), non-provision of dry fire water mains, application of Passive Fire Protection (PFP) only after confirmation from fire risk study (risk-based approach), and considering not permanently manned installation, 1...
1