1-20 of 156
Keywords: installation
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221173-MS
...Surface equipment Controller Motor valve Lubricator with appropriate internals Plunger catcher Arrival sensor artificial lift system gas lift well lift installation pagl system plunger lift system gas well production gain surface pressure chart gas lift...
Proceedings Papers

Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221336-MS
... Pipeline reeling is a common cost effective method frequently employed for the installation of offshore pipelines up to 0.5 metres in diameter. Individual lengths of pipe are fabricated into longer stalks lengths between one and three kilometers in length at a specialised onshore spool base...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215200-MS
... this, a pilot project was initiated, introducing the innovative Boron Diffused Erosion Resistant Through Tubing Sand Screen (ER TTSS) technology. The results obtained after installing this technology showed promising improvements in well performance. Boron diffused ER TTSS represents an advancement...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215237-MS
... environmental metocean and water depth range from 70 m – 100 m is limitation of crane barge for installation of offshore jacket platform. With metocean criteria and water depth in Natuna Sea, the minimum jacket weight using conventional design is about 1000 ton lifting weight, in 2019 during the Medco E&P...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215422-MS
... issues such as sand migration, gas handling, reservoir souring and scaling may also contribute to the system's inefficiency, which may result in system failure. Installing an ESP especially with an inverted pump does need an extensive monitoring capability be it downhole or on surface. Lack of essential...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215394-MS
... in offshore conditions, these wells are using specialized, feed-through-ESP hydraulic packer that enables ESP cable and gas vent line to be passed through. To ensure these wells reach the economic limit of ESP installation, this hybrid completion design is used; utilizing ESP as the main artificial lift...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215411-MS
... will discuss the performance of Malaysia's first installation of bonded bead sand screen in Well A. In contrast to conventional wire wrap or mesh filtration media, bonded bead sand screen incorporates tightly fused beads in cartridge form that act as depth filter to exclude sand, installed on a flushed...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210735-MS
... equipment scssv operation upper completion system integrity deepwater gas field packer system execution operator south china sea installation seating nipple hydraulically assembly Deepwater subsea wet-tree completions differ from conventional dry-tree completions due to their unique...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210703-MS
...Transportation & Installation Engineering Main objectives for Transportation &Installation Engineering of the project are as follows: Abstract ZEEpod is a tripod-based structure that is designed for shallow water and could be the possible attractive solution for marginal fields...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210641-MS
... the screen opening size, screen length, location and conveyance method. Post-installation, the opening up of the well is in accordance with the bean up procedure to avoid sudden surge or high velocity flow that can damage the screen. In addition, acoustic sand monitoring and sand sampling were also performed...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210725-MS
... was quickly made safe by closing a primary barrier, the downhole surface-controlled subsea safety valve (SCSSSV), and installation of a secondary barrier in the form of plugs downhole. To bring production back, the root cause was investigated, and it was determined that the straight-bore metal-to-metal seal...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210697-MS
... leakage line. Various improvements and dry gas seal system modifications were carried out to cope with the dry gas seal failures, such as the installation of duplex seal gas strainer to allow strainer replacement without shutting down the compressor. Furthermore, the Electrical Heat Tracing (EHT...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2022
Paper Number: SPE-210608-MS
... While some approaches are possible for shallow water and/or platform application, this might not be economically viable for deepwater or subsea operation. For example, well intervention to install through tubing sand control for subsea well can be very costly, while topside solid management might...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205529-MS
... adequate safety factors during installation. An optimum design requires partial foundation uplift during pile sequencing, while the areas in compression have an adequate margin of safety. A method has been developed to analyze any polygon foundation shape, which allows for uplift on any part of the mudmat...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205532-MS
... the requirements of a specific well to optimize its production. The jet pump has no moving parts and most of the time can be deployed rig-less, which drastically decreases the installation cost and time for the Operator, translated consequently to decrease the well's kick-off time to start flow. This lift system...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205554-MS
...), Fusible Plug loop installation only (instead of redundant protection using Flame Detector system), non-provision of dry fire water mains, application of Passive Fire Protection (PFP) only after confirmation from fire risk study (risk-based approach), and considering not permanently manned installation, 1...

Product(s) added to cart

Close Modal