1-20 of 60
Keywords: pipe
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215324-MS
... be carried out in short-term and single test, and cannot continuously monitor the dynamic changes of oil well production for a long time. In this paper, a technology of continuous monitoring of production profile by optical fiber is proposed. The optical cable is bundled outside the oil pipe...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202289-MS
... The solution is a modular one as each of the described bricks can be used standalone. Pipe-end measurement from various sources can be used, and the compatibility analysis provides visibility on upcoming operations without requiring mandatory usage of the smartphone app. Pipe-End Identification...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196448-MS
... Abstract Drilling operations are considered a major cost in the development phase of oil and gas wells, which places huge emphasis on drilling efficiency as a leading factor in cost reduction and optimization. Nonproductive time (NPT) incidents such as stuck pipes must be minimized by careful...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196550-MS
...1<sup>st</sup> Sidetrack Abstract An operator recently drilled and completed an onshore well in South Sumatra by intentionally leaving 3-1/2 in. drill pipe in the hole, to be used as the lower completion string. This paper documents the design and execution of this unique drill pipe...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-191898-MS
... The design removes the capacity constraint of a one-pipe solution, and offers increased flexibility by its modular design approach. The design case for the SpoolSep consist of a series of 24inch outer diameter (OD) pipes in parallel, with individual pipe lengths of 50m ( Abrand et al. 2013...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-191924-MS
...Technical Route Manufacturing Process Reinforced Thermoplastic Pipe (Adhesive Structure) There are basically two technical routes for manufacturing FCCP. They are reinforced thermoplastic pipe and reinforced thermosetting pipe. Based on these two technical routes, a variety...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-192028-MS
... system, considering the condensation and fragmentation of bubbles in the process of rising. In this study, the model is added in the simulation. Results and discussion Evaluation standard The flow-over area of the central pipe is small, and it is directly connected to the ESP. So, the capacity...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186274-MS
... and formulation drilling fluid formulation critical sour well offshore indonesia consideration drilling fluid property Upstream Oil &amp; Gas completion pipe drilling fluid chemistry requirement well integrity HPHT society of petroleum engineers loss circulation pressure window drilling operation...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186922-MS
... drilling fluids and materials circulation liquid drilling operation fractured formation plug back drilling fluid management &amp; disposal geothermal reservoir foam drilling pipe pipe incident production zone geothermal drilling hole cleaning Drilling Indonesia loss zone...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186918-MS
..., improvisation of drilling and cementing practices in near total loss situation and directional drilling techniques adopted. This would then provide the basis for future optimization in these types of wells. annular pressure drilling drilling operation drill pipe mud weight Upstream Oil &amp; Gas...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186990-MS
... of the advanced PLT in overcoming the challenges of quantifying zonal contribution in wells experiencing ADF. Reservoir Surveillance adf phenomenon phase fluid production control Upstream Oil &amp; Gas rotation fluid flow spinner production monitoring flow pattern pipe sensor ADF production...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186350-MS
... discontinuity cost-effective solution acoustic energy valve configuration society of petroleum engineers Upstream Oil &amp; Gas dynamic stress pipe fe model acoustic pressure field Finite Element Analysis Methodology Some methodologies using Finite Element Analysis (FEA) to predict dynamic...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186331-MS
... in the Subsea Blowout Preventer(SSBOP) such as the risk ofnon-productive time associated with stuck-pipe and the total influx volume increase associated with the process. Additional items discussed in this paper include managing an influx in the riser and inaccurate conventional kick detection methods...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 17–19, 2017
Paper Number: SPE-186394-MS
... Abstract Badak LNG operates two loading docks for loading LNG to transporting vessels. Each loading dock is served by two main piping systems. One piping system used to transfer the LNG from the storage tanks to the loading arms and another piping system to transfer the boil off gas (BOG) from...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, October 25–27, 2016
Paper Number: SPE-182208-MS
... to rehabilitate pipelines in marginal fields with high CO 2 content without increasing safety or environmental risks. In the appraisal stage, several technology options were considered and a thermoplastic pipe was selected as the preferred alternative compared to traditional rigid carbon steel pipeline...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 20–22, 2015
Paper Number: SPE-176471-MS
... capable of providing both breathing air and power tools in constricted work areas. During a turnaround for example, to remove a set of flange bolts from a pipe, the entire operation may take 10 minutes, but the actual operation of the air wrench may only take two minutes of that time. However, actual job...

Product(s) added to cart

Close Modal