1-8 of 8
Keywords: short string
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the APOGCE 2024, October 15–17, 2024
Paper Number: SPE-221356-MS
... reliability and performance. metal loss subsurface corrosion pipeline corrosion flowline corrosion riser corrosion data mining corrosion rate 8-inch production magnetic corrosion detection corrosion detection assessment seawater thickness short string time-lapse electromagnetic corrosion...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196392-MS
... of the selected string to prevent the gas lift robbing. The force balance is then calculated, and the PPO valve is set to the short string with the Pressure Test Rack Opening (PTRO) 585 psig at 80°F. The oil production in the robbing well observed to increase by 45% and achieved a sustainable production after...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 23–25, 2018
Paper Number: SPE-191907-MS
... of the Short String Attach the Gas Lift Injection Adapter to the gas lift injection Line Attach the CO 2 Gas Manifold to the gas lift Injection Line Ensure that all the connections and gauges are hooked up to the CO 2 Tracer Unit Turn on the CO 2 Tracer Unit and check the reading from the digital...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2010
Paper Number: SPE-134477-MS
.... The completion was designed to maximize the number of sands in each well (eleven (11) sands with six (6) zones) to gain maximum production, while at the same time the short string needs selectivity. One of the challenges was the production casing design could not be larger than 7". To facilitate selectivity...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2004
Paper Number: SPE-88494-MS
... oil & gas packer leak long string short string completion installation and operations enhanced recovery water shut-off utilizing coiled tubing production enhancement squeeze perforation obstruction cement onwj field well intervention cement slurry downhole intervention spe 88494...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference and Exhibition, October 18–20, 2004
Paper Number: SPE-88525-MS
... to produce longer and improve ultimate recovery. For the above reasons, the subject well was completed as 3-1/2" monobore as long string and 3 1/2" dual selective in short string to optimize the production gas and oil. dual packer completion upstream oil & gas packer monobore cross flow...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil and Gas Conference, October 28–31, 1996
Paper Number: SPE-36963-MS
... vincensius soetedja cement packer spe 36963 plug badak coiled tubing bridge plug short string perforation packer hunter spe 36963 gravel pack workover cement penetration upstream oil & gas reservoir long string completion installation and operations drilling fluid...

Product(s) added to cart

Close Modal