1-20 of 130
Keywords: valve
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215469-MS
... the operation. In the early stage of MPD drilling campaign, a downhole valve was installed as a mechanical wellbore isolation tool while tripping in/out when losses occur. The performance of downhole valve has been evaluated from the last 5 wells drilling campaign before drilling Suban-X well...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215238-MS
... of temperature, pressure and flow rates of layers) and sending control signals to IPAs (e.g. controlling actions of flow control valves). The maximum communication distance reaches 2000 m. The data processing and storage module, as implied by its name, processes and stores uploaded monitoring data. As shown...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215257-MS
... doors in wells completed in multiple layers, to surface controlled downhole valves with infinitely variable chokes to advanced downhole architecture with sensors that monitor inflow performance and valves that facilitate multi-zone inflow optimization. The paper also identifies challenges for current...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215265-MS
... As mentioned in figure 2 , typical problems that we focus on this project can be categorized into three main groups which are choke valves, flowlines that determine which header the production will flow into, and remote compressor package which is a rotating machinery equipment and has most...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215339-MS
... that could pave the way for reliable and cost attractive solutions for pigging operation in shallow water and deep water development in future. operation valve sapl module launching midstream oil & gas pipeline pigging hydrocarbon requirement upstream oil & gas sapl application...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215373-MS
... on the load pulse of sucker rod. Its main components include a downhole load pulse generator (DLPG) and a ground communication controller (GCC). The DLPG is installed between the tubing pump barrel and the stationary valve and is equipped with an 8.5 mm diameter stepless adjusting valve that provides access...
Proceedings Papers

Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 10–12, 2023
Paper Number: SPE-215481-MS
... minimizing the fluctuation in tubing pressures. This technology has been applied in 13 gas lift wells and has resulted in a liquid production increment of approximately 80 m 3 /d. The converging flow geometry of the novel gas lift valve has three directional ports which address the challenges posed...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205763-MS
.... The shallowest gas lift mandrel was installed at 830mMD and equipped with an IPO valve, the deepest stations were selected as DIAL units and installed at 1,170mMD and 1,830mMD, with a packer set at 1850mMD. The DIAL units were installed at hole angles of 70 and 80 degrees, benefiting from the intervention-less...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 12–14, 2021
Paper Number: SPE-205611-MS
... Abstract The paper aims to discuss various issues pertaining to gas lift system and instabilities in low producer wells along with the necessary measures for addressing those issues. The effect of various parameters such as tubing size, gas injection rate, multi-porting and gas lift valve port...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202340-MS
... lift pilot has been initiated in the field. The objective of the pilot is to collect further essential information and evaluate the challenges prior to the full field implementation. At the well scale, managing the well lift rate allocation, monitoring the performance of gas lift valves and running...
Proceedings Papers

Paper presented at the SPE Asia Pacific Oil & Gas Conference and Exhibition, November 17–19, 2020
Paper Number: SPE-202310-MS
... Abstract In the drive for remote operations, reducing operator costs and reducing emissions and CO2, digitalization of sensors and control systems is imperative. To date, valves on wellheads and trees have predominantly been controlled by hydraulic actuators that are not ideally suited...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196485-MS
... to complete the job. This alternative will be supporting as static lifting equipment to R/U all units and running all devices at the platform during well service activities such as perforation, bottom hole pressure survey and gas lift valve replacement. The success story of using offshore scaffolding pipes...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196483-MS
... Artificial Intelligence Upstream Oil & Gas co 2 gas injection return signature high deviation well optimization problem gas lift operation gas lift valve well deviation optimization tracer survey society of petroleum engineers mandrel valve artificial lift system gas lift...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196477-MS
... wells across the Greater Burgan field. Reservoir simulation is used to assess the potential benefits of installing Flow Control Valves (FCVs) in a candidate well, to control production from multiple reservoir zones. A representative sector model is defined around the candidate well, to include...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196534-MS
... is found out to be not optimum. Many unloaders at the upper part of the completion aren't necessary during its production stage and usually will be changed into a dummy valve during gas lift valve redesign (GLVR) operation. These excessive number of valves may cause many problems, such as limited gas...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196244-MS
... & Simulation pipeline simulator summate subtract operation society of petroleum engineers computer simulation wi pump Design Study valve Introduction Water Injection systems on FPSO's are becoming increasingly complex as they often inject a combination of produced water and seawater...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196255-MS
... transfer pump process-related upd availability valve interruption upd instrumentation failure downtime Upstream Oil & Gas unplanned production deferment year 2018 integrity society of petroleum engineers production facility Introduction In the upstream oil and gas production sector...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196314-MS
... collaboration and support, several non-intrusive technologies have been evaluated & implemented to solve long overdue problems such as online acoustic sand monitoring system, non-intrusive acoustic valve inspection device and active sonar meter. Overall, this paper highlights the working principles, actual...
Proceedings Papers

Paper presented at the SPE/IATMI Asia Pacific Oil & Gas Conference and Exhibition, October 29–31, 2019
Paper Number: SPE-196392-MS
... during the production time. This finding occurred in Indonesia, Offshore North West Java field, where the orifice is preferably used as the operating valve. However, Production Pressure Operating (PPO) valve is then used to replace the orifice function to overcome the problem. The methodology starts...

Product(s) added to cart

Close Modal