Reservoir flow control is important for maximizing hydrocarbon production. Traditional in-flow control devices (ICDs) attempt to balance the completion pressure differential with the reservoir pressure differential so that even flow across production zones is maintained. This maximizes oil production by delaying unwanted fluids from breaking through. Unfortunately, when lower viscosity fluids do break through, they take over the well, significantly reducing production of the desired hydrocarbon. This paper describes the design and function of a self-adjusting in-flow control device referred to as an Autonomus Inflow Control Device (AICD). When hydrocarbons are producing from all zones, the AICD will behave as a traditional ICD, balancing flow. However, when low-viscosity (undesired) fluids break through, the AICD chokes them, significantly slowing flow from the zone producing the undesirable fluids. This autonomous function enables the well to continue producing the desired hydrocarbons for a longer time, maximizing total production.

The paper describes the laboratory testing performed to evaluate the performance of a new generation AICD design in field-like conditions. This new generation design is referred to as the Range 3B, and is similar to the original design now referred to as the Range 3A (Least et.al, 2012) in that it is the same size and shape, but it allows for increased flow rates while keeping similar performance ratios. Results from single-phase experimental flow testing with model fluids and crude oil are presented and discussed.

The testing results proved that the AICD could restrict flow from zones producing undesirable fluids. The discussion further shows that if technology such as the new AICD is applied to new well completion designs, total hydrocarbon recovery will be enhanced, providing a significant benefit for production companies and those involved in design and modeling of new well completions.

You can access this article if you purchase or spend a download.