1-16 of 16
Keywords: completion
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, October 25–26, 2022
Paper Number: SPE-206958-MS
... Single-Run ESP Deployment The system requires a minimum 7-inch casing to install the integrated male wet-mate connector and shroud assembly as part of the permanent completion. The system requires a single run to install or retrieve the ESP (see fig-2 ). An isolation seal assembly...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, October 25–26, 2022
Paper Number: SPE-206902-MS
... For the given well data, 500 Series Equipment having 9 Cr metallurgy was selected along with Ytool. Upper Completion Pump: 535 Series, NP(3100-4400)H Motor – 200 HP Upper Ytool – 2.31" Profile Bypass tubing – 2 7/8" Pump Setting Depth: 1810 m MD Lower Completion Pump...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, October 25–26, 2022
Paper Number: SPE-206903-MS
... Abstract PETRONAS completed Well H16 in BS field, East Malaysia with a Digital Intelligent Artificial Lift (DIAL) – an improvement to the current applied gas lift system in the field for production optimization system. This DIAL installation represents the first ever successful installation...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192456-MS
..." configuration without the need of external wireline intervention. The switch from dummy to live valve occurs via use of a temporary dis-integrable plug made out of proprietary degradable alloy, which completely degrades away in the well after the duration chosen by the operation. The valve design...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192516-MS
... of the existing tubing size for insert anchor and flowing bottom hole pressure (FBHP). Secondly, rigless installation with economic advantage in comparison to installation with rig is discussed. Thirdly, the successful completion of installing SRP in 3 ½" tubing rigless is discussed with various existing failed...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184221-MS
... completion mandrel evolution valve gas lift Efficiency innovation flexibility Upstream Oil & Gas Lift system intervention operation reliability society of petroleum engineers Gas lift history Gas lift is a method of artificial lift that uses an external source of high-pressure gas...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184216-MS
... Abstract Three successive ESPs have been installed in a horizontal well in the Rijn oilfield, offshore The Netherlands. Very soon after installation of the first completion, the ESP started to gaslock. Operational procedures based on data analysis were setup in an attempt to suppress...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184207-MS
... artificial lift system in terms of energy consumption. This article highlights the technology features, the related benefits observed and the performance recorded on a heavy oil field in Middle East in cold production. induction motor Upstream Oil & Gas progressing cavity pump completion PM...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184211-MS
... based on motor requirement at the deepest layer. Applying the overdesigned method delivers an optimum trade-off between lifetime, cumulative production, economic value with ESP system efficiency to produce the well in Mamburungan field. artificial lift system Upstream Oil & Gas completion...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184225-MS
... Abstract Completion and artificial lift most commonly designed by skilled and specialized engineers in there domain and misunderstand the need from each other's. This is even more accurate when it comes to the understanding of other domain such as production, reservoir, and workover. When...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184205-MS
... Abstract This paper presents the first ever successful Sliding Sleeve Door (SSD) Jet Pump application in Ghauri oil field located in Jhelum, Pakistan. Ghauri is a single completed well flowed with 22 API gravity from the Sakessar Formation. Because the well is a solution gas drive reservoir...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184175-MS
... analysis, when completed (using boroscope, pump test, destructive analysis), bring key information in order to better understand root causes of failures and modify or upgrade the technology and practices to push the limits of the AMPCP system. The full chain of value is vertically integrated, from concept...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184181-MS
... completion. Simple motors and protectors changed to tandem to prevent water penetration inside motor. Power cable was changed from Galvanized to Monel Armor for high corrosiveness. Completion wise, one or double 1/2" water dilution lines were adopted, run along tubing, connected to tail pipe which run...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 26–27, 2014
Paper Number: SPE-173696-MS
... stage of the field life to maintain reservoir pressure above saturation pressure and sweeping oil toward the oil producers. The wells operate under gas lift and ESP's were introduced as artificial lift methods, the ESP's developed to hybrid system after using four completion scenarios which...
Proceedings Papers

Paper presented at the SPE Artificial Lift Conference and Exhibition, November 27–28, 2012
Paper Number: SPE-163117-MS
... in a total oil column of ~360m. Ground level elevations range from 175–200m above MSL. ( Figure-2 ) Horizontal wells completed with stand alone screens (SAS) and inflow control devices (ICDs) are planned for the blocky FM3 and FM4 units and these wells form an important part of maintaining the initial...
Proceedings Papers

Paper presented at the SPE Artificial Lift Conference and Exhibition, November 27–28, 2012
Paper Number: SPE-163116-MS
... to maintain wellbore temperature above Wax Appearance Temperature (WAT) for the self flowing and ESP lifted wells. Horizontal producers with ESP as a primary mode of artificial lift and jet pump as secondary mode ( Fig.4 ). The lower completion consist of 8-1/2" open hole with conventional screens...

Product(s) added to cart

Close Modal