1-5 of 5
Keywords: completion equipment
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, October 25–26, 2022
Paper Number: SPE-206998-MS
... completion equipment insulation intake well petroleum engineer cable insulation operation upstream oil & gas valve artificial lift system cable protection recommended practice pad well armor Introduction Well pads have different shape and Numbers and play an important role...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, October 25–26, 2022
Paper Number: SPE-206994-MS
... technology can also be used in other artificial lift systems. artificial lift system assembly packer upstream oil & gas sub surface safety valve installation cable deployed electric submersible pump spsssv cdesp pump sub surface safety valve completion equipment surface safety valve...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192479-MS
... Well Intervention Upstream Oil & Gas Completion Installation and Operations completion equipment connector cable deployable esp lubricator well logging Drillstem Testing drillstem/well testing ESP Wellhead power cable installation design basis Engineer permanent magnet technology...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192469-MS
... protector section and a 456 series 150-hp ESP motor section. Completion Equipment Selection Completion Design As shown by Camilleri and Gambier (2013) , as well as Bespalov (2016) , selection of a specific completion architecture is driven by a combination of factors, including applicable well...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184198-MS
... be considered in designing a suitable completion architecture that would allow rigless replacements without a drilling rig or a hoist while adhering to applicable well control requirements. artificial lift system barrier element completion equipment intervention well control policy application...

Product(s) added to cart

Close Modal