1-5 of 5
Keywords: completion equipment
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, October 25–26, 2022
Paper Number: SPE-206998-MS
... completion equipment insulation intake well petroleum engineer cable insulation operation upstream oil & gas valve artificial lift system cable protection recommended practice pad well armor Introduction Well pads have different shape and Numbers and play an important role...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, October 25–26, 2022
Paper Number: SPE-206994-MS
... cable deployed electric submersible pump spsssv cdesp pump sub surface safety valve completion equipment surface safety valve application As a result of the economic benefits and the performance available from permanent magnet motors (PMM) ( Gorbunov, 2017 ), there has been a revitilised...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192469-MS
... harsh downhole environments with high H 2 S content. It also addresses several key parameters such as success criteria, selection of completion equipment, well control contingencies to adhere to operator’s policies, and details of the planning and execution phases. The paper also provides a comparison...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192479-MS
... production, and avoids the need to schedule expensive drilling rigs from their primary purpose. log analysis downhole intervention production enhancement Well Intervention Upstream Oil & Gas Completion Installation and Operations completion equipment connector cable deployable esp...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184198-MS
... be considered in designing a suitable completion architecture that would allow rigless replacements without a drilling rig or a hoist while adhering to applicable well control requirements. artificial lift system barrier element completion equipment intervention well control policy application...

Product(s) added to cart

Close Modal