1-18 of 18
Keywords: run life
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, October 25–26, 2022
Paper Number: SPE-206928-MS
.... The lower coefficient of friction resulting from the coating reduces the abrasion between the coupling and the tubing. In that way, the risk of tubing holes can be reduced. After a coating solution was implemented in selected problematic wells, the rod run life could in average been tripled with no failures...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192464-MS
... In recent times, the field performance has been affected by the high frequency of failures in wells with the PCP system installed, reducing drastically the average Run Life and increasing the Failure Index for this system, all of which translate into higher operating costs (OPEX) for the company...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192495-MS
... than the ESP itself. Having a reliable ESP with good average run life is critical to the operational economics. In sweet or benign reservoirs, ESP run life can easily exceed five (5) years through careful design, selection, manufacture, installation and operational practices. When taking an ESP system...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192470-MS
... remotely adjusting the operation parameters using the monitoring system. The result shows how real-time monitoring system improved ESP system run life and maximized oil production. In addition, we look into details how the monitoring system enhances overall ESP efficiency and reduces the number of trips...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192460-MS
... Intelligence gas lift diagnostic phase calculation metric volumetric efficiency artificial lift system asset and portfolio management field development optimization and planning modeling Efficiency run life gas lift system level analytic workflow target flow rate flow rate evaluation machine...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192468-MS
... market of oil and gas. ESP reliability is a major factor that influence decisions among other related factors such as cost, delivery, etc. It is common to use central tendency parameters such as average run life, and mean time between failures, to quantify or estimate ESP reliability, or to compare...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192508-MS
... by Camilleri and Macdonald (2010 ) and summarized in Table 1 . Downtime for shut-off wells in terms of days; i.e., time between ESP being shut off and successful, stable restart. Statistical run-life history for each pilot well to assess the efficiency of having proactive alerts and improved decision...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192507-MS
... determining the specifications required of the ESP equipment to avoid premature failures (run life less than 90 days). The analysis included a specific matrix for root cause identification and several lessons learned over the 32 months of experience in this mature field. The methodology used...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184183-MS
... candidate selection to identify the most challenging wells with a known history of short run life primarily due to excessive sand and gas production. A new abrasion-resistant pump with enhanced compression design was installed in four wells as a pilot project. This count increased to 11 by Q2 2016...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184179-MS
... to minimize or eliminate the sand attack to the ESPs are discussed. Upstream Oil & Gas resistance shaft downthrust sand control onshore oil field run life esp suffer erosion artificial lift system sand production ESP erosional wear bearing impeller flow stage thrust washer floater...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184224-MS
... temperature is ~ 2° C lower than the reservoir temperature of 53° C which impacts the completion design and affects the flow assurance of the field. In recent times, the field production has been impacted by frequent work-overs in the field. The run life of the PCP systems, which was impacted by tubing...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184220-MS
... presents a redesigned Medium Voltage VSD that is significantly smaller and incorporates new technologies that present an added bonus in additional cost savings and characteristics that can increase the run life of the ESP. A typical offshore installation has one 2,000KVA Step Down transformer...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184173-MS
... knowledge, would add more sense to the collected data. The use of reliability analysis for the estimation of run life of electrical submersible pump (ESP) has been sparsely applied in the oil field to predict the availability of a mechanical system such ESP. This is of a paramount importance to predict...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184171-MS
... Abstract Increased production uptime, extending electric submersible pump (ESP) run life, and decreasing workover costs are critical for well profitability. ESP applications in the North Sea face the challenge of remote access where workover costs are high and rig availability is limited...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 26–27, 2014
Paper Number: SPE-173699-MS
... to transports reservoir fluid to the surface. Production optimization found to be an essential for the life cycle of each system in order to extended run life, decrease and increase the cumulative production per well. The applied artificial lift systems in our mature field case study include electrical...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 26–27, 2014
Paper Number: SPE-173703-MS
... is left idle until incremental flow rate is needed at a later date. This paper will highlight the major issues encountered with the utilization of ESP operations, together with the technical developments applied to realize longer ESP run-life objectives. Also presented are the field observations...
Proceedings Papers

Paper presented at the SPE Artificial Lift Conference and Exhibition, November 27–28, 2012
Paper Number: SPE-163112-MS
... operations in 77 wells and spanned 3.5 years. Index Terms – Sucker Rod Pumps, SRP, Run Life, MTBF, Design Parameters, Well Parameters beam pumping relation statistical study salinity upstream oil & gas adiyaman sucker rod pump spe 163112 flow rate run life artificial lift system...
Proceedings Papers

Paper presented at the SPE Artificial Lift Conference and Exhibition, November 27–28, 2012
Paper Number: SPE-163115-MS
... The main goal for Artificial Lift in Block 64 is to provide a high rate lift system that is efficient, the least complicated and robust enough to survive severe downhole conditions at the Situche field. Run life, from initial pump installation, would be a minimum 2 ½ years, with no early time...

Product(s) added to cart

Close Modal