1-6 of 6
Keywords: shutdown
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, October 29–30, 2024
Paper Number: SPE-221541-MS
... production monitoring production control upper esp frequency artificial lift system configuration geologist petroleum play type esp lower esp application power requirement shutdown high temperature requirement philosophy operational philosophy installation sequency booster esp esp...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, October 29–30, 2024
Paper Number: SPE-221560-MS
..., and premature equipment failures (less than 180 days run life) decreased by 63.7%. In a distribution of approximately 35,000 shutdowns, the 24/7 monitoring and optimization team operator observed ~48% fewer high motor temperature shutdowns than the cumulative average for Bakken operators. This paper presents...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, October 25–26, 2022
Paper Number: SPE-206953-MS
... life cycle management service. ESP gas locks as a result of operating below the bubblepoint in a depleted reservoir (even with a system equipped with gas-handling devices and downhole gas separators) Massive ESP shutdowns generated by electrical supply blackouts Limited monitoring and field...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 28–29, 2018
Paper Number: SPE-192470-MS
.... Remote monitoring provides analysts with access to the well for remote ESP optimization that significantly reduces the number of ESP shutdowns and decreases HSE incidents related to field trips and interfacing with surface units. This paper presents a comparison between ESP performance before and after...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 30–December 1, 2016
Paper Number: SPE-184223-MS
... in a substantial reduction of flushbys and extended the run life of the PCPs. progressing cavity pump eastern australia shutdown Extend PCP Run Life coal seam discharge port Upstream Oil & Gas pressure actuated relief valve operator Australia actuator society of petroleum engineers valve new...
Proceedings Papers

Paper presented at the SPE Middle East Artificial Lift Conference and Exhibition, November 26–27, 2014
Paper Number: SPE-173703-MS
... submersible pump run life dismantle inspection Upstream Oil & Gas penetrator protector Artificial Intelligence inspection ESP Saudi Arabia insulation decompression run life procedure installation packer penetrator esp data analysis shutdown ESP failure production rate society...

Product(s) added to cart

Close Modal