Skip Nav Destination
Close Modal
Update search
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
Filter
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
- Paper Number
NARROW
Format
Subjects
Article Type
Date
Availability
1-20 of 30
Keywords: completion
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
1
Sort by
Proceedings Papers
Successful Installation of a New 15K Multistage Frac (MSF) Completion in a Challenging Extended Reach Lateral HPHT Gas Well
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, May 12–14, 2025
Paper Number: SPE-224892-MS
... Abstract The methodology described in this paper represented permits to introduce a new open-hole 15K multistage frac (MSF) completion solution in a challenging gas well environment, like high dog-leg severity (DLS) range, washed out boreholes, tight spots and extreme differential pressures...
Proceedings Papers
Strategic Methodology to Unlock Hydrocarbon Volumes Thru Additional Stimulation: Opportunities from Oman Tight Gas Fields
Available to PurchaseAdnan Al Hinai, Ghusun Al Amri, Al Muatasam Al Hashami, Omar Al Raisi, Dawood Al Kharusi, Ali Al Ghaithi
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, May 12–14, 2025
Paper Number: SPE-224939-MS
... Abstract The primary aim of this paper is to illustrate the engineering and petro-physical evaluation adopted to unlock hydrocarbon opportunities from shut in/closed-in wells, shallow opportunities, very low producers, and completely new stimulation treatment, including both conventional...
Proceedings Papers
Evaluation of Wafra 2E Single Well Injection Test to De-Risk a Polymer Flood Multi-Well Test
Available to PurchaseYounis Osman, Adam Jackson, Basim Al-Rowaih, Jamal Al-Rubaiyea, Graeme Lobley, Nayi Arismendi, Ahaad Al Mutairi, Preston Fernandes, Bader Thekrallah
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, May 12–14, 2025
Paper Number: SPE-225045-MS
... with several well patterns. This will include drilling and completing three new horizontal water/polymer injection wells within existing vertical production well patterns. The producers were established for a Second Eocene Water Injection Pilot (SEWIP) area that never completed the execution of water injection...
Proceedings Papers
Well Integrity Evaluation Through a Completion Redesign for Cyclic Steam Stimulation in Non-Thermal Wells of the Zuata Principal Field in the Orinoco Oil Belt – Venezuela
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, May 12–14, 2025
Paper Number: SPE-225077-MS
... Principal Field. The unconsolidated sands and high permeability of the reservoirs necessitate a robust casing design to withstand potential axial loads arising from thermal expansion during production and mechanical stresses encountered during drilling and completion operations ( Gonzalez et al., 2019...
Proceedings Papers
Innovative Slug-And-Sweep Gravel Pack Approach with Novel Relative Permeability Modifier for Reliable Gravel Pack Operations in Long-Producer Intervals: Lessons from a 20-Well Campaign in Iraq
Available to PurchaseJ. Corrales, A. Al-Lawi, K. Aliedani, M. Ahmed, A. Agrawal, J. Tellez, M. Ramirez, A. Masoodi, E. Chuc, X. Alarcon, I.M Taha, A. Ghonim, A. El Beltagy
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, May 12–14, 2025
Paper Number: SPE-225082-MS
.... Usually, the maximum interval length in CHGP completions for oil producers in this area ranges from 30 to 50 m, with leak-off managed by pumping high-rate sand control treatments. In the current scenario, CHGP completions for water-producer wells exceeded 120 m, which requires unusual methods to ensure...
Proceedings Papers
A Groundbreaking Rigless Workover Approach in Congested Locations: Introducing Hydraulic Workover Unit in ADNOC Onshore to Support Responsible Energy Growth in the United Arab Emirates
Available to PurchaseYgnacio Nunez, Mouza Ali Al Nuaimi, Ghany Rachman, Renny Alexis Ottolina, Ahmed Magdy, Qaisar Khan Marwat, Giuseppe Ambrosi, Rakesh Palappetta
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, May 12–14, 2025
Paper Number: SPE-225184-MS
... limited to completion change-outs but including milling, fishing, plug & abandonments and a broader range of activities. The deployment of the first HWO unit for AON confirmed the ability to allow operations on locations with multiple constraints in terms of reduced site preparation requirements...
Proceedings Papers
Industry First: 7-5/8" Casing Open Hole Gravel Pack Completion with Distributed Temperature Sensing Technology in ACG Field
Available to PurchaseJavid Aliyev, Natig Kerimov, Naila Salimova, Gulay Gambarova, Telman Mirzayev, Almardan Aslanli, Yoliandri Susilo, Ravan Adilov, Ravana Karimova, Umid Tarlanli
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, May 12–14, 2025
Paper Number: SPE-225135-MS
..., receiver, and communication processor, as well as an optical fiber integrated into the well completion. A double-ended fiber configuration is preferred, as it allows bi-directional laser pulses to improve measurement reliability and compensate for potential signal losses. Value of DTS in ACG DTS has...
Proceedings Papers
Field Reactivation Using Innovative and Long-Term High-Alloy Coiled-Tubing Gas Lift System in Highly Corrosive Mediterranean Offshore Field, Libya
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, April 22–24, 2024
Paper Number: SPE-218574-MS
... overcome by naturally restarting the field. However, recently with the increased water cut, a greater volume of water flooding into the oil-producing zones would make it impossible to reactivate the field without use of artificial lift systems. Installing any artificial lift means in a monobore completion...
Proceedings Papers
A Unique Solution Designed to Deploy 15k Multi-Stage Fracturing Systems Successfully in Horizontal Wells With Complex Profiles, Resulting in 100% Success Rates with 6 Days of Savings Per Well
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, April 22–24, 2024
Paper Number: SPE-218512-MS
... Abstract Deployment of Open Hole Multistage Fracturing (OH MSF) completion system in long horizontal wells has always been a daunting task, and often presents high risk of getting stuck in open hole due to complex completion design with very stiff assemblies that include multiple large OD...
Proceedings Papers
Optimizing Field Performance with Flow Control Technologies: A Case Study of Reducing Carbon Intensity in Oil Production in the Sultanate of Oman
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, April 22–24, 2024
Paper Number: SPE-218695-MS
..., with hundreds of wells completed with AICD completion, reduced carbon emissions during prolonged periods of production. The study introduces a workflow that uses a publicly available Greenhouse Gas (GHG) estimator for different field development plans. The production data of 28 wells from a reservoir...
Proceedings Papers
Applications of Advanced Multifunction Pulsed Neutron Measurements for Cased-Hole Formation Evaluation in a Mature Field
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, April 22–24, 2024
Paper Number: SPE-218808-MS
... Abstract Efficient formation evaluation in heterogenous carbonate and clastic reservoirs is indispensable for estimating reserves and optimizing the testing and completion scheme of wells. E&P companies rely heavily on open hole logs to acquire a wide spectrum of measurements necessary...
Proceedings Papers
Innovative Thermal Well Completion Design Yields Substantial Enhancement in Steam Injection Capacity
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, April 22–24, 2024
Paper Number: SPE-218750-MS
... of the most innovative design optimizations which were implemented for the first time: Semi-Flush 5.5" Steam Completion and 7" Steam Completion The main challenges that were mapped out and tackled during the implementation were, the 7-production casing ID limitation and the gas cap procedures and mitigations...
Proceedings Papers
Best Practices Acquired in Ecuador, to Complete Horizontal Wells with Low Formation Pressure
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, April 22–24, 2024
Paper Number: SPE-218800-MS
... Abstract This paper aims to present the best practices acquired in Ecuador, Orient Basin, from 2016 until 2023, during the completion of 25 horizontal wells with low reservoir formation pressure and an average of 1,000 feet of horizontal section. This analysis covers three main risks identified...
Proceedings Papers
Multifaceted Smart Completion Application: A Gulf of Mexico Case Study
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, April 22–24, 2024
Paper Number: SPE-218794-MS
...) [1] . Nonetheless, GOM reservoirs have complex depositional settings. Reservoir heterogeneity, stacked pay system, reservoir compartmentalization, high-temp and pressure are some of the common challenges seen in these fields. The use of conventional completion design in vertical wells with commingled...
Proceedings Papers
Overcoming Geological Uncertainty Through Enhanced Drilling and Completion Techniques in Sabah Deepwater, Malaysia
Available to PurchaseNoppanan Nopsiri, Purin Tattawasart, Elvy Samuel, Lee Choon How, Henrikus Amperanto, Low Kok Wee, Mohd Azri B Mohd Aris, Mohamed Zamrud Zainal, Tan Kiang Meng, Thakerngchai Sangvaree
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, April 22–24, 2024
Paper Number: SPE-218773-MS
..., thus, require meticulous planning across all aspects. This paper aims to discuss & elaborate what has been done in each phase starting from planning phase for drilling and completion with inputs on subsurface matters throughout the phase of operation and contingency execution. The main focus...
Proceedings Papers
Production Optimisation by Retrofitting Autonomous Inflow Control Devices into an ICD Well in a Oil Reservoir Offshore China
Available to PurchaseXiaofei Gao, Ling Dai, Jia Liu, Xinbo Zou, LiQian Xu, Guang Yang, Mojtaba Moradi, Michael Konopczynski, Jingheng Hua
Publisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, March 21–23, 2022
Paper Number: SPE-200124-MS
... a heterogeneous formation with varying properties resulting in an uneven reservoir influx toward the wellbore. Although the well was already completed with passive ICDs, oil production from the well started suffering severely from an early water breakthrough in a couple of weeks after starting production...
Proceedings Papers
Evaluation of Inflow Control Device Effectiveness to Mitigate Thermally Induced Fractures in Injection Wells
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, March 21–23, 2022
Paper Number: SPE-200185-MS
... a 3D reservoir thermal simulator coupled with a 2D TIF model and a geomechanical model. The impact of different completions in injection well with TIF modelling under different scenarios is investigated. The added value of ICD was quantified and proved to be effective in controlling TIF initiation...
Proceedings Papers
Cost Efficient Polymer Full Field Development by Fast Tracking Nap Concept in Horizontal Polymer Injectors
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, March 21–23, 2022
Paper Number: SPE-200166-MS
... improvement polymer injection completion horizontal polymer injector Introduction The Oil Field is located in South Oman in a geological area called the Oman Southern Central Salt basin; it is part of a multiple-field cluster with similar oil characteristics. In general, the cluster's oil fields...
Proceedings Papers
Using Autonomous Inflow Control Device Completion to Manage Gas Breakthrough Challenges
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE Conference at Oman Petroleum & Energy Show, March 21–23, 2022
Paper Number: SPE-200168-MS
...) this can result in loss of oil production. This challenge can potentially be addressed by implementing an advanced inflow control valve completion to suppress the gas-oil ratio (GOR) and maintain oil production. Uneven inflow in a horizontal oil well will usually occur due to a pressure drop in the liner...
Proceedings Papers
Hydraulic Concentric Tubular Pumping System for Lifting Oil in EOR Completions
Available to PurchasePublisher: Society of Petroleum Engineers (SPE)
Paper presented at the SPE EOR Conference at Oil and Gas West Asia, March 26–28, 2018
Paper Number: SPE-190344-MS
... for thermal and chemical EOR methods to enhance the lifetime of the completions. As a result of the natural phase separation of liquids and gases the presented pumping system has shown to be the ideal choice for the usage in all types of wells for gas injection EOR methods too. This completely new pump type...
1