1-5 of 5
Keywords: miscible method
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE Permian Basin Oil and Gas Recovery Conference, May 15–17, 2001
Paper Number: SPE-70066-MS
... override during injection into vertical wells. Chugh et al describe a model study and consequent field implementation of such a miscible injector in the Virginia Hills field (a sister reservoir to SSHU) in 1997. 4 miscible method upstream oil & gas injection profile gravity override...
Proceedings Papers

Paper presented at the SPE Permian Basin Oil and Gas Recovery Conference, March 23–26, 1998
Paper Number: SPE-39793-MS
... to be adequate for field scale CO-foam simulation. The results also confirm that the communication path between the foam injection well and the offending well had a strong impact on the production performance. P. 365 enhanced recovery foam pilot area historical data miscible method mobility history...
Proceedings Papers

Paper presented at the SPE Permian Basin Oil and Gas Recovery Conference, March 23–26, 1998
Paper Number: SPE-39791-MS
... oil enhanced recovery permeability injectivity core sample oil saturation toluene fluid dynamics poor quality rock miscible method SPE 39791 Laboratory Investigation of Infectivity Losses During WAG in West Texas Dolomites J. Kamath, F. M. Nakagawa, R. E. Boyer, Chevron Petroleum...
Proceedings Papers

Paper presented at the Permian Basin Oil and Gas Recovery Conference, March 16–18, 1994
Paper Number: SPE-27675-MS
... or minimum pressure gradient for the onset of foam generation. P. 483^ enhanced recovery mobility society of petroleum engineers interstitial velocity miscible method surfactant foam generation resistance factor foam parameter foam test surfactant concentration foam quality flow...
Proceedings Papers

Paper presented at the SPE Permian Basin Oil Recovery Conference, March 11–12, 1974
Paper Number: SPE-4804-MS
... miles wide by 12 miles long. Waterflood operations were started in 1954. By 1972, over 280 million barrels of oil had been produced by waterflood. enhanced recovery miscible method Upstream Oil & Gas Sacroc Unit operation natural gas flood compressor pipeline pressure limit...

Product(s) added to cart

Close Modal