1-3 of 3
Keywords: fbhp
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/AAPG/SEG Asia Pacific Unconventional Resources Technology Conference, November 16–18, 2021
Paper Number: URTEC-208270-MS
... Abstract Most coal seam gas (CSG) wells in Queensland require some form of artificial lift to remove water and initiate the liberation of gas adsorbed onto the coal matrix. Careful management of the flowing bottom hole pressure (FBHP) is a standard practice in CSG operations. Inducing rapid...
Proceedings Papers

Paper presented at the SPE/AAPG/SEG Asia Pacific Unconventional Resources Technology Conference, November 18–19, 2019
Paper Number: URTEC-198240-MS
... multiphase flow linear regression model flow rate linear regression water flow rate interaction FBHP pairwise interaction predictor variable CSG well coal seam gas Upstream Oil & Gas neural network model prediction prediction accuracy neural network approach Akaike , H. 1974...
Proceedings Papers

Paper presented at the SPE/AAPG/SEG Asia Pacific Unconventional Resources Technology Conference, November 18–19, 2019
Paper Number: URTEC-198311-MS
.... hydraulic fracturing drillstem/well testing reservoir pressure production control Drillstem Testing drawdown buildup cycle FBHP Reservoir Surveillance Upstream Oil & Gas m-dda model production rate average pressure average reservoir pressure pressure transient Clarkson conventional dda...

Product(s) added to cart

Close Modal