1-1 of 1
Keywords: fracture string
Close
Sort by
Proceedings Papers

Paper presented at the SPE/AAPG/SEG Unconventional Resources Technology Conference, July 22–24, 2019
Paper Number: URTEC-2019-150-MS
.... The operation was successful and the whipstock was pulled free (Fig. 13). Figure 13- Washover operations Junction Completed: The Level 4 junction was successfully completed. The 5 1/2-in. fracture string with a seal assembly attached was run and landed in the PBR. Pressure tests down the annulus and tubing were...

Product(s) added to cart

Close Modal