1-13 of 13
Keywords: completion
Close
Follow your search
Access your saved searches in your account

Would you like to receive an alert when new items match your search?
Close Modal
Sort by
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-102116-MS
... also be taken into consideration while planning for ERD wells. We can take the example of Wytch Farm extended reach drilling by British Petroleum which has created a new milestone by drilling and completion of an ERD well with an horizontal displacement of 35,196 ft. the Wytch Farm oil field had three...
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-101994-MS
... Abstract The stacked sands of the South Tapti field have presented completion challenges from field start-up in 1997 to the present-day. A large part of these challenges have been caused by reactive shales interbedding the sand bodies. This has had a persistent influence on the sandface...
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-101848-MS
... composition compressive strength slurry composition high temperature thermal cycling cement sheath fluid dynamics flow in porous media sagd completion graphite liquid permeability permeability drilling fluids and materials metakaolin slurry composition duration spe iadc 101848 Cement System...
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-103763-MS
... fish-tail multilateral are being completed and it is planned to have level-3 multilateral, ultra shot radius and way forward as Under Balance Drilling (UBD) and horizontal wells etc. This involves the higher well cost due to higher rig rate and more operational complications like stuck pipes & mud...
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-101810-MS
... of these innovative lightweight slurry systems in terms of better well completion, reduced cost, improved productivity and less safety/environmental hazards in cementing across highly depleted zones and weaker formations. The details of the development, case studies of successful field implementation alongwith...
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-103668-MS
... Abstract This paper will discuss a Monobore one trip cement through completion system. The system was designed to add artificial lift capabilities and improve safety to short life monobore wells. The disposable well bore concept is gaining popularity in regions worldwide. This paper will also...
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-101231-MS
... products to match the delicate surface chemistry on the coal, a matting system to provide both borehole stability and minimize fluid losses to the cleats, and a BREAKER method of removing the matting system once drilling is completed. Field results from three horizontal wells will be discussed, two...
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-104476-MS
... by the horizontal program where in the grey areas of cutting bed formation, hole cleaning, imperative drilling and drilling fluid practices dictated the completion of any well. The final Phase of the ERD program showed the critical aspect of minimization of pore pressure transmission and gauge of hole...
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-104470-MS
... Upstream Oil & Gas adoption completion progressive increase PDC bit progressively ERD well wellhead platform departure Mumbai High Drilling asia government extended reach drilling programme pipe horizontal well reservoir india government natural ga corp glycol mud well length...
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-101237-MS
... across the openhole H1 reservoir. Following the well testing results on the appraisal well, a full qualitative analysis of the well type suitable for these reservoirs was completed. The analysis looked in depth at other sand exclusion methods available, including traditional openhole horizontal gravel...
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-104110-MS
... Abstract Ideally, a reservoir drill-in fluid (RDF) possessing both an oil external phase for drilling and a water external phase for completion would provide the ideal solution for drilling and completing a well. Through the manipulation of surfactant chemistry, a novel reversible invert...
Proceedings Papers

Paper presented at the SPE/IADC Indian Drilling Technology Conference and Exhibition, October 16–18, 2006
Paper Number: SPE-102011-MS
... casing designs by eliminating conventional and expandable contingency casing strings without sacrificing completion and production performance. This advantage allows the operator to drive down well costs by minimizing the well's "flat" time on the drilling curve and using conventional long, tied-back...

Product(s) added to cart

Close Modal